Photo |
Name |
Article |
Price |
|
OGNEZA PM(V)-L Fire prevention ventilation sleeve, d 125 (price on request) [Code number: 1r0007]
Details
|
1r0007 |
|
Application purpose:
- For fire protection of ventilation ducts
Characteristics:
- fire resistance not less than EI 180;
- when the temperature rises to +150 °C, the fire-retardant material of the fire-fighting sleeve expands tenfold.
Compound:
- metal case (painted with polymer powder paint);
- an insert in the form of a tape made of a special thermally expanding material "OGNEZA-TRM";
- lamellas;
- sealant made of thermally expanding material;
- fastening eyelets.
Mounting scheme:
Installation Recommendations:
- installation is carried out at temperatures from -50 °С to +60 °С;
- the installation site is pre-cleaned;
- the attachment points should not have cracks, and the thickness of the hard layer should allow the installation of a fixing metal dowel;
- mounted in channels with an internal diameter of 125 mm to 240 mm;
- the gap between the channel wall and the coupling should not be more than 5 mm;
- the coupling is installed in the channel, after which the points of attachment of the lugs to the enclosing structure are marked with a marker;
- holes are drilled and dowels are installed (must be metal!);
- the coupling is fixed with self-tapping screws.
Diameter: DN 125.
|
|
OGNEZA PM(V)-L Fire prevention ventilation sleeve, d 130 (price on request) [Code number: 1r0008]
Details
|
1r0008 |
|
Application purpose:
- For fire protection of ventilation ducts
Characteristics:
- fire resistance not less than EI 180;
- when the temperature rises to +150 °C, the fire-retardant material of the fire-fighting sleeve expands tenfold.
Compound:
- metal case (painted with polymer powder paint);
- an insert in the form of a tape made of a special thermally expanding material "OGNEZA-TRM";
- lamellas;
- sealant made of thermally expanding material;
- fastening eyelets.
Mounting scheme:
Installation Recommendations:
- installation is carried out at temperatures from -50 °С to +60 °С;
- the installation site is pre-cleaned;
- the attachment points should not have cracks, and the thickness of the hard layer should allow the installation of a fixing metal dowel;
- mounted in channels with an internal diameter of 125 mm to 240 mm;
- the gap between the channel wall and the coupling should not be more than 5 mm;
- the coupling is installed in the channel, after which the points of attachment of the lugs to the enclosing structure are marked with a marker;
- holes are drilled and dowels are installed (must be metal!);
- the coupling is fixed with self-tapping screws.
Diameter: DN 130.
|
|
OGNEZA PM(V)-L Fire prevention ventilation sleeve, d 140 (price on request) [Code number: 1r0009]
Details
|
1r0009 |
|
Application purpose:
- For fire protection of ventilation ducts
Characteristics:
- fire resistance not less than EI 180;
- when the temperature rises to +150 °C, the fire-retardant material of the fire-fighting sleeve expands tenfold.
Compound:
- metal case (painted with polymer powder paint);
- an insert in the form of a tape made of a special thermally expanding material "OGNEZA-TRM";
- lamellas;
- sealant made of thermally expanding material;
- fastening eyelets.
Mounting scheme:
Installation Recommendations:
- installation is carried out at temperatures from -50 °С to +60 °С;
- the installation site is pre-cleaned;
- the attachment points should not have cracks, and the thickness of the hard layer should allow the installation of a fixing metal dowel;
- mounted in channels with an internal diameter of 125 mm to 240 mm;
- the gap between the channel wall and the coupling should not be more than 5 mm;
- the coupling is installed in the channel, after which the points of attachment of the lugs to the enclosing structure are marked with a marker;
- holes are drilled and dowels are installed (must be metal!);
- the coupling is fixed with self-tapping screws.
Diameter: DN 140.
|
|
OGNEZA PM(V)-L Fire prevention ventilation sleeve, d 150 (price on request) [Code number: 1r0010]
Details
|
1r0010 |
|
Application purpose:
- For fire protection of ventilation ducts
Characteristics:
- fire resistance not less than EI 180;
- when the temperature rises to +150 °C, the fire-retardant material of the fire-fighting sleeve expands tenfold.
Compound:
- metal case (painted with polymer powder paint);
- an insert in the form of a tape made of a special thermally expanding material "OGNEZA-TRM";
- lamellas;
- sealant made of thermally expanding material;
- fastening eyelets.
Mounting scheme:
Installation Recommendations:
- installation is carried out at temperatures from -50 °С to +60 °С;
- the installation site is pre-cleaned;
- the attachment points should not have cracks, and the thickness of the hard layer should allow the installation of a fixing metal dowel;
- mounted in channels with an internal diameter of 125 mm to 240 mm;
- the gap between the channel wall and the coupling should not be more than 5 mm;
- the coupling is installed in the channel, after which the points of attachment of the lugs to the enclosing structure are marked with a marker;
- holes are drilled and dowels are installed (must be metal!);
- the coupling is fixed with self-tapping screws.
Diameter: DN 150.
|
|
OGNEZA PM(V)-L Fire prevention ventilation sleeve, d 160 (price on request) [Code number: 1r0011]
Details
|
1r0011 |
|
Application purpose:
- For fire protection of ventilation ducts
Characteristics:
- fire resistance not less than EI 180;
- when the temperature rises to +150 °C, the fire-retardant material of the fire-fighting sleeve expands tenfold.
Compound:
- metal case (painted with polymer powder paint);
- an insert in the form of a tape made of a special thermally expanding material "OGNEZA-TRM";
- lamellas;
- sealant made of thermally expanding material;
- fastening eyelets.
Mounting scheme:
Installation Recommendations:
- installation is carried out at temperatures from -50 °С to +60 °С;
- the installation site is pre-cleaned;
- the attachment points should not have cracks, and the thickness of the hard layer should allow the installation of a fixing metal dowel;
- mounted in channels with an internal diameter of 125 mm to 240 mm;
- the gap between the channel wall and the coupling should not be more than 5 mm;
- the coupling is installed in the channel, after which the points of attachment of the lugs to the enclosing structure are marked with a marker;
- holes are drilled and dowels are installed (must be metal!);
- the coupling is fixed with self-tapping screws.
Diameter: DN 160.
|
|
OGNEZA PM(V)-L Fire prevention ventilation sleeve, d 170 (price on request) [Code number: 1r0012]
Details
|
1r0012 |
|
Application purpose:
- For fire protection of ventilation ducts
Characteristics:
- fire resistance not less than EI 180;
- when the temperature rises to +150 °C, the fire-retardant material of the fire-fighting sleeve expands tenfold.
Compound:
- metal case (painted with polymer powder paint);
- an insert in the form of a tape made of a special thermally expanding material "OGNEZA-TRM";
- lamellas;
- sealant made of thermally expanding material;
- fastening eyelets.
Mounting scheme:
Installation Recommendations:
- installation is carried out at temperatures from -50 °С to +60 °С;
- the installation site is pre-cleaned;
- the attachment points should not have cracks, and the thickness of the hard layer should allow the installation of a fixing metal dowel;
- mounted in channels with an internal diameter of 125 mm to 240 mm;
- the gap between the channel wall and the coupling should not be more than 5 mm;
- the coupling is installed in the channel, after which the points of attachment of the lugs to the enclosing structure are marked with a marker;
- holes are drilled and dowels are installed (must be metal!);
- the coupling is fixed with self-tapping screws.
Diameter: DN 170.
|
|
OGNEZA PM(V)-L Fire prevention ventilation sleeve, d 180 (price on request) [Code number: 1r0013]
Details
|
1r0013 |
|
Application purpose:
- For fire protection of ventilation ducts
Characteristics:
- fire resistance not less than EI 180;
- when the temperature rises to +150 °C, the fire-retardant material of the fire-fighting sleeve expands tenfold.
Compound:
- metal case (painted with polymer powder paint);
- an insert in the form of a tape made of a special thermally expanding material "OGNEZA-TRM";
- lamellas;
- sealant made of thermally expanding material;
- fastening eyelets.
Mounting scheme:
Installation Recommendations:
- installation is carried out at temperatures from -50 °С to +60 °С;
- the installation site is pre-cleaned;
- the attachment points should not have cracks, and the thickness of the hard layer should allow the installation of a fixing metal dowel;
- mounted in channels with an internal diameter of 125 mm to 240 mm;
- the gap between the channel wall and the coupling should not be more than 5 mm;
- the coupling is installed in the channel, after which the points of attachment of the lugs to the enclosing structure are marked with a marker;
- holes are drilled and dowels are installed (must be metal!);
- the coupling is fixed with self-tapping screws.
Diameter: DN 180.
|
|
OGNEZA PM(V)-L Fire prevention ventilation sleeve, d 190 (price on request) [Code number: 1r0014]
Details
|
1r0014 |
|
Application purpose:
- For fire protection of ventilation ducts
Characteristics:
- fire resistance not less than EI 180;
- when the temperature rises to +150 °C, the fire-retardant material of the fire-fighting sleeve expands tenfold.
Compound:
- metal case (painted with polymer powder paint);
- an insert in the form of a tape made of a special thermally expanding material "OGNEZA-TRM";
- lamellas;
- sealant made of thermally expanding material;
- fastening eyelets.
Mounting scheme:
Installation Recommendations:
- installation is carried out at temperatures from -50 °С to +60 °С;
- the installation site is pre-cleaned;
- the attachment points should not have cracks, and the thickness of the hard layer should allow the installation of a fixing metal dowel;
- mounted in channels with an internal diameter of 125 mm to 240 mm;
- the gap between the channel wall and the coupling should not be more than 5 mm;
- the coupling is installed in the channel, after which the points of attachment of the lugs to the enclosing structure are marked with a marker;
- holes are drilled and dowels are installed (must be metal!);
- the coupling is fixed with self-tapping screws.
Diameter: DN 190.
|
|
OGNEZA PM(V)-L Fire prevention ventilation sleeve, d 200 (price on request) [Code number: 1r0015]
Details
|
1r0015 |
|
Application purpose:
- For fire protection of ventilation ducts
Characteristics:
- fire resistance not less than EI 180;
- when the temperature rises to +150 °C, the fire-retardant material of the fire-fighting sleeve expands tenfold.
Compound:
- metal case (painted with polymer powder paint);
- an insert in the form of a tape made of a special thermally expanding material "OGNEZA-TRM";
- lamellas;
- sealant made of thermally expanding material;
- fastening eyelets.
Mounting scheme:
Installation Recommendations:
- installation is carried out at temperatures from -50 °С to +60 °С;
- the installation site is pre-cleaned;
- the attachment points should not have cracks, and the thickness of the hard layer should allow the installation of a fixing metal dowel;
- mounted in channels with an internal diameter of 125 mm to 240 mm;
- the gap between the channel wall and the coupling should not be more than 5 mm;
- the coupling is installed in the channel, after which the points of attachment of the lugs to the enclosing structure are marked with a marker;
- holes are drilled and dowels are installed (must be metal!);
- the coupling is fixed with self-tapping screws.
Diameter: DN 200.
|
|
OGNEZA PM(V)-L Fire prevention ventilation sleeve, d 210 (price on request) [Code number: 1r0016]
Details
|
1r0016 |
|
Application purpose:
- For fire protection of ventilation ducts
Characteristics:
- fire resistance not less than EI 180;
- when the temperature rises to +150 °C, the fire-retardant material of the fire-fighting sleeve expands tenfold.
Compound:
- metal case (painted with polymer powder paint);
- an insert in the form of a tape made of a special thermally expanding material "OGNEZA-TRM";
- lamellas;
- sealant made of thermally expanding material;
- fastening eyelets.
Mounting scheme:
Installation Recommendations:
- installation is carried out at temperatures from -50 °С to +60 °С;
- the installation site is pre-cleaned;
- the attachment points should not have cracks, and the thickness of the hard layer should allow the installation of a fixing metal dowel;
- mounted in channels with an internal diameter of 125 mm to 240 mm;
- the gap between the channel wall and the coupling should not be more than 5 mm;
- the coupling is installed in the channel, after which the points of attachment of the lugs to the enclosing structure are marked with a marker;
- holes are drilled and dowels are installed (must be metal!);
- the coupling is fixed with self-tapping screws.
Diameter: DN 210.
|
|
OGNEZA PM(V)-L Fire prevention ventilation sleeve, d 220 (price on request) [Code number: 1r0017]
Details
|
1r0017 |
|
Application purpose:
- For fire protection of ventilation ducts
Characteristics:
- fire resistance not less than EI 180;
- when the temperature rises to +150 °C, the fire-retardant material of the fire-fighting sleeve expands tenfold.
Compound:
- metal case (painted with polymer powder paint);
- an insert in the form of a tape made of a special thermally expanding material "OGNEZA-TRM";
- lamellas;
- sealant made of thermally expanding material;
- fastening eyelets.
Mounting scheme:
Installation Recommendations:
- installation is carried out at temperatures from -50 °С to +60 °С;
- the installation site is pre-cleaned;
- the attachment points should not have cracks, and the thickness of the hard layer should allow the installation of a fixing metal dowel;
- mounted in channels with an internal diameter of 125 mm to 240 mm;
- the gap between the channel wall and the coupling should not be more than 5 mm;
- the coupling is installed in the channel, after which the points of attachment of the lugs to the enclosing structure are marked with a marker;
- holes are drilled and dowels are installed (must be metal!);
- the coupling is fixed with self-tapping screws.
Diameter: DN 220.
|
|
OGNEZA PM(V)-L Fire prevention ventilation sleeve, d 230 (price on request) [Code number: 1r0018]
Details
|
1r0018 |
|
Application purpose:
- For fire protection of ventilation ducts
Characteristics:
- fire resistance not less than EI 180;
- when the temperature rises to +150 °C, the fire-retardant material of the fire-fighting sleeve expands tenfold.
Compound:
- metal case (painted with polymer powder paint);
- an insert in the form of a tape made of a special thermally expanding material "OGNEZA-TRM";
- lamellas;
- sealant made of thermally expanding material;
- fastening eyelets.
Mounting scheme:
Installation Recommendations:
- installation is carried out at temperatures from -50 °С to +60 °С;
- the installation site is pre-cleaned;
- the attachment points should not have cracks, and the thickness of the hard layer should allow the installation of a fixing metal dowel;
- mounted in channels with an internal diameter of 125 mm to 240 mm;
- the gap between the channel wall and the coupling should not be more than 5 mm;
- the coupling is installed in the channel, after which the points of attachment of the lugs to the enclosing structure are marked with a marker;
- holes are drilled and dowels are installed (must be metal!);
- the coupling is fixed with self-tapping screws.
Diameter: DN 230.
|
|
OGNEZA PM(V)-L Fire prevention ventilation sleeve, d 240 (price on request) [Code number: 1r0019]
Details
|
1r0019 |
|
Application purpose:
- For fire protection of ventilation ducts
Characteristics:
- fire resistance not less than EI 180;
- when the temperature rises to +150 °C, the fire-retardant material of the fire-fighting sleeve expands tenfold.
Compound:
- metal case (painted with polymer powder paint);
- an insert in the form of a tape made of a special thermally expanding material "OGNEZA-TRM";
- lamellas;
- sealant made of thermally expanding material;
- fastening eyelets.
Mounting scheme:
Installation Recommendations:
- installation is carried out at temperatures from -50 °С to +60 °С;
- the installation site is pre-cleaned;
- the attachment points should not have cracks, and the thickness of the hard layer should allow the installation of a fixing metal dowel;
- mounted in channels with an internal diameter of 125 mm to 240 mm;
- the gap between the channel wall and the coupling should not be more than 5 mm;
- the coupling is installed in the channel, after which the points of attachment of the lugs to the enclosing structure are marked with a marker;
- holes are drilled and dowels are installed (must be metal!);
- the coupling is fixed with self-tapping screws.
Diameter: DN 240.
|
|
OGNEZA PM(V)-T Fire prevention ventilation sleeve, d 125 (price on request) [Code number: 1r0020]
Details
|
1r0020 |
|
Application purpose:
- For installation with plastic ventilation ducts
- For residential buildings (including apartment buildings), hospitals, hostels, hotels, shopping centers, airports and train stations, industrial enterprises
Characteristics:
- fire resistance not less than EI 180;
- suitable for walls with an additional partition and an air gap between them.
Compound:
- perforated fixed sleeve body;
- metal case of the movable sleeve (painted with polymer powder paint);
- thermally expanding material "OGNEZA-TRM";
- movable sleeve seal;
- lamellas;
- fastening eyelets.
Installation Recommendations:
- installation is carried out at temperatures from -50 °С to +60 °С;
- the installation site is pre-cleaned;
- the attachment points should not have cracks, and the thickness of the hard layer should allow the installation of a fixing metal dowel;
- the gap between the sleeve and the channel wall must be less than 5 mm;
- fixing eyes are bent in the plane of the base of the coupling;
- the coupling is installed in the channel, after which the points of attachment of the lugs to the enclosing structure are marked with a marker.
Diameter: DN 125.
|
|
OGNEZA PM(V)-T Fire prevention ventilation sleeve, d 132 (price on request) [Code number: 1r0021]
Details
|
1r0021 |
|
Application purpose:
- For installation with plastic ventilation ducts
- For residential buildings (including apartment buildings), hospitals, hostels, hotels, shopping centers, airports and train stations, industrial enterprises
Characteristics:
- fire resistance not less than EI 180;
- suitable for walls with an additional partition and an air gap between them.
Compound:
- perforated fixed sleeve body;
- metal case of the movable sleeve (painted with polymer powder paint);
- thermally expanding material "OGNEZA-TRM";
- movable sleeve seal;
- lamellas;
- fastening eyelets.
Installation Recommendations:
- installation is carried out at temperatures from -50 °С to +60 °С;
- the installation site is pre-cleaned;
- the attachment points should not have cracks, and the thickness of the hard layer should allow the installation of a fixing metal dowel;
- the gap between the sleeve and the channel wall must be less than 5 mm;
- fixing eyes are bent in the plane of the base of the coupling;
- the coupling is installed in the channel, after which the points of attachment of the lugs to the enclosing structure are marked with a marker.
Diameter: DN 132.
|
|
OGNEZA PM(V)-T Fire prevention ventilation sleeve, d 140 (price on request) [Code number: 1r0022]
Details
|
1r0022 |
|
Application purpose:
- For installation with plastic ventilation ducts
- For residential buildings (including apartment buildings), hospitals, hostels, hotels, shopping centers, airports and train stations, industrial enterprises
Characteristics:
- fire resistance not less than EI 180;
- suitable for walls with an additional partition and an air gap between them.
Compound:
- perforated fixed sleeve body;
- metal case of the movable sleeve (painted with polymer powder paint);
- thermally expanding material "OGNEZA-TRM";
- movable sleeve seal;
- lamellas;
- fastening eyelets.
Installation Recommendations:
- installation is carried out at temperatures from -50 °С to +60 °С;
- the installation site is pre-cleaned;
- the attachment points should not have cracks, and the thickness of the hard layer should allow the installation of a fixing metal dowel;
- the gap between the sleeve and the channel wall must be less than 5 mm;
- fixing eyes are bent in the plane of the base of the coupling;
- the coupling is installed in the channel, after which the points of attachment of the lugs to the enclosing structure are marked with a marker.
Diameter: DN 140.
|
|
OGNEZA PM(V)-T Fire prevention ventilation sleeve, d 150 (price on request) [Code number: 1r0023]
Details
|
1r0023 |
|
Application purpose:
- For installation with plastic ventilation ducts
- For residential buildings (including apartment buildings), hospitals, hostels, hotels, shopping centers, airports and train stations, industrial enterprises
Characteristics:
- fire resistance not less than EI 180;
- suitable for walls with an additional partition and an air gap between them.
Compound:
- perforated fixed sleeve body;
- metal case of the movable sleeve (painted with polymer powder paint);
- thermally expanding material "OGNEZA-TRM";
- movable sleeve seal;
- lamellas;
- fastening eyelets.
Installation Recommendations:
- installation is carried out at temperatures from -50 °С to +60 °С;
- the installation site is pre-cleaned;
- the attachment points should not have cracks, and the thickness of the hard layer should allow the installation of a fixing metal dowel;
- the gap between the sleeve and the channel wall must be less than 5 mm;
- fixing eyes are bent in the plane of the base of the coupling;
- the coupling is installed in the channel, after which the points of attachment of the lugs to the enclosing structure are marked with a marker.
Diameter: DN 150.
|
|
OGNEZA PM(V)-T Fire prevention ventilation sleeve, d 160 (price on request) [Code number: 1r0024]
Details
|
1r0024 |
|
Application purpose:
- For installation with plastic ventilation ducts
- For residential buildings (including apartment buildings), hospitals, hostels, hotels, shopping centers, airports and train stations, industrial enterprises
Characteristics:
- fire resistance not less than EI 180;
- suitable for walls with an additional partition and an air gap between them.
Compound:
- perforated fixed sleeve body;
- metal case of the movable sleeve (painted with polymer powder paint);
- thermally expanding material "OGNEZA-TRM";
- movable sleeve seal;
- lamellas;
- fastening eyelets.
Installation Recommendations:
- installation is carried out at temperatures from -50 °С to +60 °С;
- the installation site is pre-cleaned;
- the attachment points should not have cracks, and the thickness of the hard layer should allow the installation of a fixing metal dowel;
- the gap between the sleeve and the channel wall must be less than 5 mm;
- fixing eyes are bent in the plane of the base of the coupling;
- the coupling is installed in the channel, after which the points of attachment of the lugs to the enclosing structure are marked with a marker.
Diameter: DN 160.
|
|
OGNEZA PM(V)-T Fire prevention ventilation sleeve, d 170 (price on request) [Code number: 1r0025]
Details
|
1r0025 |
|
Application purpose:
- For installation with plastic ventilation ducts
- For residential buildings (including apartment buildings), hospitals, hostels, hotels, shopping centers, airports and train stations, industrial enterprises
Characteristics:
- fire resistance not less than EI 180;
- suitable for walls with an additional partition and an air gap between them.
Compound:
- perforated fixed sleeve body;
- metal case of the movable sleeve (painted with polymer powder paint);
- thermally expanding material "OGNEZA-TRM";
- movable sleeve seal;
- lamellas;
- fastening eyelets.
Installation Recommendations:
- installation is carried out at temperatures from -50 °С to +60 °С;
- the installation site is pre-cleaned;
- the attachment points should not have cracks, and the thickness of the hard layer should allow the installation of a fixing metal dowel;
- the gap between the sleeve and the channel wall must be less than 5 mm;
- fixing eyes are bent in the plane of the base of the coupling;
- the coupling is installed in the channel, after which the points of attachment of the lugs to the enclosing structure are marked with a marker.
Diameter: DN 170.
|
|
OGNEZA PM(V)-T Fire prevention ventilation sleeve, d 180 (price on request) [Code number: 1r0026]
Details
|
1r0026 |
|
Application purpose:
- For installation with plastic ventilation ducts
- For residential buildings (including apartment buildings), hospitals, hostels, hotels, shopping centers, airports and train stations, industrial enterprises
Characteristics:
- fire resistance not less than EI 180;
- suitable for walls with an additional partition and an air gap between them.
Compound:
- perforated fixed sleeve body;
- metal case of the movable sleeve (painted with polymer powder paint);
- thermally expanding material "OGNEZA-TRM";
- movable sleeve seal;
- lamellas;
- fastening eyelets.
Installation Recommendations:
- installation is carried out at temperatures from -50 °С to +60 °С;
- the installation site is pre-cleaned;
- the attachment points should not have cracks, and the thickness of the hard layer should allow the installation of a fixing metal dowel;
- the gap between the sleeve and the channel wall must be less than 5 mm;
- fixing eyes are bent in the plane of the base of the coupling;
- the coupling is installed in the channel, after which the points of attachment of the lugs to the enclosing structure are marked with a marker.
Diameter: DN 180.
|