Hauraton borders can be divided into two types:
Photo | Name | Article | Price | ||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Hauraton LINEFIX STANDARD Border, made of PP, 1500x80x45 mm [Code number: 43110]
Details
|
43110 | ||||||||||||||
|
|||||||||||||||
Hauraton LINEFIX SUPER Border, galvanised, 1500x20x175 mm [Code number: 43210]
Details
|
43210 | ||||||||||||||
|
|||||||||||||||
Hauraton LINEFIX SUPER Border, stainless steel, 1500x20x175 mm (price on request) [Code number: 43230]
Details
|
43230 | ||||||||||||||
|
|||||||||||||||
Hauraton SPORTFIX Soft kerbs, white, 1000x60x200 mm (price on request) [Code number: 7200]
Details
|
7200 | ||||||||||||||
Application purpose:
Installation diagram of sand traps and soft curbs for the option of installing sand traps in two rows Installation diagram of sand traps and soft curbs for the option of installing sand traps in one row General installation guidelines 1. The size of the concrete casing indicated in the drawings:
The depth of the trench from the design position of the upper layer of the sports covering to the upper layer of the frost-resistant layer:
2. Install the tracing line in accordance with the level, according to the project. 3. Sand traps and soft curbs are installed in a trench on a concrete base (foundation), the thickness of which should be d = 100 mm. The concrete base (foundation) is made of concrete grade B25 F200, W6, P4. The base (foundation) is equipped with a previously prepared frost-resistant layer. Temporary exposure of the foundation for 4-12 hours. 4. Equip a leveling layer of cement mortar in a ratio of 1: 3 with a thickness of 20-30 mm (cement mortar is prepared at the work site). A curb and a sand trap are installed together in the wet cement slurry in the design position, using a tracing string and a building level. The upper surface of the grit trap should be flush with the upper surface of the soft collapsible attachment of the soft curb. 5. The curb and sand trap are fixed with cement mortar - the caulking height is 30-50 mm. The cross-sectional shape of the caulking is triangular. 6. The concreting of the side parts is carried out with the concrete mixture B25 F200, W6, P4. The concrete mix is laid without breaks, with a consistent laying direction in one direction. The concrete mix is compacted by bayonetting, followed by leveling and grouting the surface of the laid mix. The width of the side parts of the concrete frame is specified in clause 1.
Download instructions for arranging a jump pit: General instructions for arranging a jump pit Download installation example: Running track / sand pit class A 15 Download installation example: Running track / sand pit class A 15 |
|||||||||||||||
Hauraton SPORTFIX Soft kerbs, white, 1000x60x250 mm (price on request) [Code number: 7201]
Details
|
7201 | ||||||||||||||
Application purpose:
Installation diagram of sand traps and soft curbs for the option of installing sand traps in two rows Installation diagram of sand traps and soft curbs for the option of installing sand traps in one row General installation guidelines 1. The size of the concrete casing indicated in the drawings:
The depth of the trench from the design position of the upper layer of the sports covering to the upper layer of the frost-resistant layer:
2. Install the tracing line in accordance with the level, according to the project. 3. Sand traps and soft curbs are installed in a trench on a concrete base (foundation), the thickness of which should be d = 100 mm. The concrete base (foundation) is made of concrete grade B25 F200, W6, P4. The base (foundation) is equipped with a previously prepared frost-resistant layer. Temporary exposure of the foundation for 4-12 hours. 4. Equip a leveling layer of cement mortar in a ratio of 1: 3 with a thickness of 20-30 mm (cement mortar is prepared at the work site). A curb and a sand trap are installed together in the wet cement slurry in the design position, using a tracing string and a building level. The upper surface of the grit trap should be flush with the upper surface of the soft collapsible attachment of the soft curb. 5. The curb and sand trap are fixed with cement mortar - the caulking height is 30-50 mm. The cross-sectional shape of the caulking is triangular. 6. The concreting of the side parts is carried out with the concrete mixture B25 F200, W6, P4. The concrete mix is laid without breaks, with a consistent laying direction in one direction. The concrete mix is compacted by bayonetting, followed by leveling and grouting the surface of the laid mix. The width of the side parts of the concrete frame is specified in clause 1.
Download instructions for arranging a jump pit: General instructions for arranging a jump pit Download installation example: Running track / sand pit class A 15 Download installation example: Running track / sand pit class A 15 |
|||||||||||||||
Hauraton SPORTFIX Soft kerbs, white, 1000x60x300 mm (price on request) [Code number: 7202]
Details
|
7202 | ||||||||||||||
Application purpose:
Installation diagram of sand traps and soft curbs for the option of installing sand traps in two rows Installation diagram of sand traps and soft curbs for the option of installing sand traps in one row General installation guidelines 1. The size of the concrete casing indicated in the drawings:
The depth of the trench from the design position of the upper layer of the sports covering to the upper layer of the frost-resistant layer:
2. Install the tracing line in accordance with the level, according to the project. 3. Sand traps and soft curbs are installed in a trench on a concrete base (foundation), the thickness of which should be d = 100 mm. The concrete base (foundation) is made of concrete grade B25 F200, W6, P4. The base (foundation) is equipped with a previously prepared frost-resistant layer. Temporary exposure of the foundation for 4-12 hours. 4. Equip a leveling layer of cement mortar in a ratio of 1: 3 with a thickness of 20-30 mm (cement mortar is prepared at the work site). A curb and a sand trap are installed together in the wet cement slurry in the design position, using a tracing string and a building level. The upper surface of the grit trap should be flush with the upper surface of the soft collapsible attachment of the soft curb. 5. The curb and sand trap are fixed with cement mortar - the caulking height is 30-50 mm. The cross-sectional shape of the caulking is triangular. 6. The concreting of the side parts is carried out with the concrete mixture B25 F200, W6, P4. The concrete mix is laid without breaks, with a consistent laying direction in one direction. The concrete mix is compacted by bayonetting, followed by leveling and grouting the surface of the laid mix. The width of the side parts of the concrete frame is specified in clause 1.
Download instructions for arranging a jump pit: General instructions for arranging a jump pit Download installation example: Running track / sand pit class A 15 Download installation example: Running track / sand pit class A 15 |
|||||||||||||||
Hauraton SPORTFIX Soft kerbs, white, 1000x60x400 mm (price on request) [Code number: 7203]
Details
|
7203 | ||||||||||||||
Application purpose:
Installation diagram of sand traps and soft curbs for the option of installing sand traps in two rows Installation diagram of sand traps and soft curbs for the option of installing sand traps in one row General installation guidelines 1. The size of the concrete casing indicated in the drawings:
The depth of the trench from the design position of the upper layer of the sports covering to the upper layer of the frost-resistant layer:
2. Install the tracing line in accordance with the level, according to the project. 3. Sand traps and soft curbs are installed in a trench on a concrete base (foundation), the thickness of which should be d = 100 mm. The concrete base (foundation) is made of concrete grade B25 F200, W6, P4. The base (foundation) is equipped with a previously prepared frost-resistant layer. Temporary exposure of the foundation for 4-12 hours. 4. Equip a leveling layer of cement mortar in a ratio of 1: 3 with a thickness of 20-30 mm (cement mortar is prepared at the work site). A curb and a sand trap are installed together in the wet cement slurry in the design position, using a tracing string and a building level. The upper surface of the grit trap should be flush with the upper surface of the soft collapsible attachment of the soft curb. 5. The curb and sand trap are fixed with cement mortar - the caulking height is 30-50 mm. The cross-sectional shape of the caulking is triangular. 6. The concreting of the side parts is carried out with the concrete mixture B25 F200, W6, P4. The concrete mix is laid without breaks, with a consistent laying direction in one direction. The concrete mix is compacted by bayonetting, followed by leveling and grouting the surface of the laid mix. The width of the side parts of the concrete frame is specified in clause 1.
Download instructions for arranging a jump pit: General instructions for arranging a jump pit Download installation example: Running track / sand pit class A 15 Download installation example: Running track / sand pit class A 15 |
|||||||||||||||
Hauraton SPORTFIX Soft kerbs, white, 500x60x400 mm (price on request) [Code number: 7204]
Details
|
7204 | ||||||||||||||
Application purpose:
Installation diagram of sand traps and soft curbs for the option of installing sand traps in two rows Installation diagram of sand traps and soft curbs for the option of installing sand traps in one row General installation guidelines 1. The size of the concrete casing indicated in the drawings:
The depth of the trench from the design position of the upper layer of the sports covering to the upper layer of the frost-resistant layer:
2. Install the tracing line in accordance with the level, according to the project. 3. Sand traps and soft curbs are installed in a trench on a concrete base (foundation), the thickness of which should be d = 100 mm. The concrete base (foundation) is made of concrete grade B25 F200, W6, P4. The base (foundation) is equipped with a previously prepared frost-resistant layer. Temporary exposure of the foundation for 4-12 hours. 4. Equip a leveling layer of cement mortar in a ratio of 1: 3 with a thickness of 20-30 mm (cement mortar is prepared at the work site). A curb and a sand trap are installed together in the wet cement slurry in the design position, using a tracing string and a building level. The upper surface of the grit trap should be flush with the upper surface of the soft collapsible attachment of the soft curb. 5. The curb and sand trap are fixed with cement mortar - the caulking height is 30-50 mm. The cross-sectional shape of the caulking is triangular. 6. The concreting of the side parts is carried out with the concrete mixture B25 F200, W6, P4. The concrete mix is laid without breaks, with a consistent laying direction in one direction. The concrete mix is compacted by bayonetting, followed by leveling and grouting the surface of the laid mix. The width of the side parts of the concrete frame is specified in clause 1.
Download instructions for arranging a jump pit: General instructions for arranging a jump pit Download installation example: Running track / sand pit class A 15 Download installation example: Running track / sand pit class A 15 |
|||||||||||||||
Hauraton SPORTFIX Soft kerbs, angle pieces, white, 250x60x300 mm (price on request) [Code number: 7208]
Details
|
7208 | ||||||||||||||
Application purpose:
Installation diagram of sand traps and soft curbs for the option of installing sand traps in two rows Installation diagram of sand traps and soft curbs for the option of installing sand traps in one row General installation guidelines 1. The size of the concrete casing indicated in the drawings:
The depth of the trench from the design position of the upper layer of the sports covering to the upper layer of the frost-resistant layer:
2. Install the tracing line in accordance with the level, according to the project. 3. Sand traps and soft curbs are installed in a trench on a concrete base (foundation), the thickness of which should be d = 100 mm. The concrete base (foundation) is made of concrete grade B25 F200, W6, P4. The base (foundation) is equipped with a previously prepared frost-resistant layer. Temporary exposure of the foundation for 4-12 hours. 4. Equip a leveling layer of cement mortar in a ratio of 1: 3 with a thickness of 20-30 mm (cement mortar is prepared at the work site). A curb and a sand trap are installed together in the wet cement slurry in the design position, using a tracing string and a building level. The upper surface of the grit trap should be flush with the upper surface of the soft collapsible attachment of the soft curb. 5. The curb and sand trap are fixed with cement mortar - the caulking height is 30-50 mm. The cross-sectional shape of the caulking is triangular. 6. The concreting of the side parts is carried out with the concrete mixture B25 F200, W6, P4. The concrete mix is laid without breaks, with a consistent laying direction in one direction. The concrete mix is compacted by bayonetting, followed by leveling and grouting the surface of the laid mix. The width of the side parts of the concrete frame is specified in clause 1.
Download instructions for arranging a jump pit: General instructions for arranging a jump pit Download installation example: Running track / sand pit class A 15 Download installation example: Running track / sand pit class A 15 |
|||||||||||||||
Hauraton SPORTFIX Soft kerbs, angle pieces, white, 250x60x400 mm (price on request) [Code number: 7209]
Details
|
7209 | ||||||||||||||
Application purpose:
Installation diagram of sand traps and soft curbs for the option of installing sand traps in two rows Installation diagram of sand traps and soft curbs for the option of installing sand traps in one row General installation guidelines 1. The size of the concrete casing indicated in the drawings:
The depth of the trench from the design position of the upper layer of the sports covering to the upper layer of the frost-resistant layer:
2. Install the tracing line in accordance with the level, according to the project. 3. Sand traps and soft curbs are installed in a trench on a concrete base (foundation), the thickness of which should be d = 100 mm. The concrete base (foundation) is made of concrete grade B25 F200, W6, P4. The base (foundation) is equipped with a previously prepared frost-resistant layer. Temporary exposure of the foundation for 4-12 hours. 4. Equip a leveling layer of cement mortar in a ratio of 1: 3 with a thickness of 20-30 mm (cement mortar is prepared at the work site). A curb and a sand trap are installed together in the wet cement slurry in the design position, using a tracing string and a building level. The upper surface of the grit trap should be flush with the upper surface of the soft collapsible attachment of the soft curb. 5. The curb and sand trap are fixed with cement mortar - the caulking height is 30-50 mm. The cross-sectional shape of the caulking is triangular. 6. The concreting of the side parts is carried out with the concrete mixture B25 F200, W6, P4. The concrete mix is laid without breaks, with a consistent laying direction in one direction. The concrete mix is compacted by bayonetting, followed by leveling and grouting the surface of the laid mix. The width of the side parts of the concrete frame is specified in clause 1.
Download instructions for arranging a jump pit: General instructions for arranging a jump pit Download installation example: Running track / sand pit class A 15 Download installation example: Running track / sand pit class A 15 |
|||||||||||||||
Hauraton SPORTFIX Soft kerbs, black, 1000x60x200 mm (price on request) [Code number: 7220]
Details
|
7220 | ||||||||||||||
Application purpose:
Characteristics:
Installation diagram of sand traps and soft curbs for the option of installing sand traps in two rows Installation diagram of sand traps and soft curbs for the option of installing sand traps in one row General installation guidelines 1. The size of the concrete casing indicated in the drawings:
The depth of the trench from the design position of the upper layer of the sports covering to the upper layer of the frost-resistant layer:
2. Install the tracing line in accordance with the level, according to the project. 3. Sand traps and soft curbs are installed in a trench on a concrete base (foundation), the thickness of which should be d = 100 mm. The concrete base (foundation) is made of concrete grade B25 F200, W6, P4. The base (foundation) is equipped with a previously prepared frost-resistant layer. Temporary exposure of the foundation for 4-12 hours. 4. Equip a leveling layer of cement mortar in a ratio of 1: 3 with a thickness of 20-30 mm (cement mortar is prepared at the work site). A curb and a sand trap are installed together in the wet cement slurry in the design position, using a tracing string and a building level. The upper surface of the grit trap should be flush with the upper surface of the soft collapsible attachment of the soft curb. 5. The curb and sand trap are fixed with cement mortar - the caulking height is 30-50 mm. The cross-sectional shape of the caulking is triangular. 6. The concreting of the side parts is carried out with the concrete mixture B25 F200, W6, P4. The concrete mix is laid without breaks, with a consistent laying direction in one direction. The concrete mix is compacted by bayonetting, followed by leveling and grouting the surface of the laid mix. The width of the side parts of the concrete frame is specified in clause 1.
Download instructions for arranging a jump pit: General instructions for arranging a jump pit Download installation example: Running track / sand pit class A 15 Download installation example: Running track / sand pit class A 15 |
|||||||||||||||
Hauraton SPORTFIX Soft kerbs, black, 1000x60x250 mm (price on request) [Code number: 7221]
Details
|
7221 | ||||||||||||||
Application purpose:
Characteristics:
Installation diagram of sand traps and soft curbs for the option of installing sand traps in two rows Installation diagram of sand traps and soft curbs for the option of installing sand traps in one row General installation guidelines 1. The size of the concrete casing indicated in the drawings:
The depth of the trench from the design position of the upper layer of the sports covering to the upper layer of the frost-resistant layer:
2. Install the tracing line in accordance with the level, according to the project. 3. Sand traps and soft curbs are installed in a trench on a concrete base (foundation), the thickness of which should be d = 100 mm. The concrete base (foundation) is made of concrete grade B25 F200, W6, P4. The base (foundation) is equipped with a previously prepared frost-resistant layer. Temporary exposure of the foundation for 4-12 hours. 4. Equip a leveling layer of cement mortar in a ratio of 1: 3 with a thickness of 20-30 mm (cement mortar is prepared at the work site). A curb and a sand trap are installed together in the wet cement slurry in the design position, using a tracing string and a building level. The upper surface of the grit trap should be flush with the upper surface of the soft collapsible attachment of the soft curb. 5. The curb and sand trap are fixed with cement mortar - the caulking height is 30-50 mm. The cross-sectional shape of the caulking is triangular. 6. The concreting of the side parts is carried out with the concrete mixture B25 F200, W6, P4. The concrete mix is laid without breaks, with a consistent laying direction in one direction. The concrete mix is compacted by bayonetting, followed by leveling and grouting the surface of the laid mix. The width of the side parts of the concrete frame is specified in clause 1.
Download instructions for arranging a jump pit: General instructions for arranging a jump pit Download installation example: Running track / sand pit class A 15 Download installation example: Running track / sand pit class A 15 |
|||||||||||||||
Hauraton SPORTFIX Soft kerbs, black, 1000x60x300 mm (price on request) [Code number: 7222]
Details
|
7222 | ||||||||||||||
Application purpose:
Characteristics:
Installation diagram of sand traps and soft curbs for the option of installing sand traps in two rows Installation diagram of sand traps and soft curbs for the option of installing sand traps in one row General installation guidelines 1. The size of the concrete casing indicated in the drawings:
The depth of the trench from the design position of the upper layer of the sports covering to the upper layer of the frost-resistant layer:
2. Install the tracing line in accordance with the level, according to the project. 3. Sand traps and soft curbs are installed in a trench on a concrete base (foundation), the thickness of which should be d = 100 mm. The concrete base (foundation) is made of concrete grade B25 F200, W6, P4. The base (foundation) is equipped with a previously prepared frost-resistant layer. Temporary exposure of the foundation for 4-12 hours. 4. Equip a leveling layer of cement mortar in a ratio of 1: 3 with a thickness of 20-30 mm (cement mortar is prepared at the work site). A curb and a sand trap are installed together in the wet cement slurry in the design position, using a tracing string and a building level. The upper surface of the grit trap should be flush with the upper surface of the soft collapsible attachment of the soft curb. 5. The curb and sand trap are fixed with cement mortar - the caulking height is 30-50 mm. The cross-sectional shape of the caulking is triangular. 6. The concreting of the side parts is carried out with the concrete mixture B25 F200, W6, P4. The concrete mix is laid without breaks, with a consistent laying direction in one direction. The concrete mix is compacted by bayonetting, followed by leveling and grouting the surface of the laid mix. The width of the side parts of the concrete frame is specified in clause 1.
Download instructions for arranging a jump pit: General instructions for arranging a jump pit Download installation example: Running track / sand pit class A 15 Download installation example: Running track / sand pit class A 15 |
|||||||||||||||
Hauraton SPORTFIX Soft kerbs, black, 1000x60x400 mm (price on request) [Code number: 7223]
Details
|
7223 | ||||||||||||||
Application purpose:
Characteristics:
Installation diagram of sand traps and soft curbs for the option of installing sand traps in two rows Installation diagram of sand traps and soft curbs for the option of installing sand traps in one row General installation guidelines 1. The size of the concrete casing indicated in the drawings:
The depth of the trench from the design position of the upper layer of the sports covering to the upper layer of the frost-resistant layer:
2. Install the tracing line in accordance with the level, according to the project. 3. Sand traps and soft curbs are installed in a trench on a concrete base (foundation), the thickness of which should be d = 100 mm. The concrete base (foundation) is made of concrete grade B25 F200, W6, P4. The base (foundation) is equipped with a previously prepared frost-resistant layer. Temporary exposure of the foundation for 4-12 hours. 4. Equip a leveling layer of cement mortar in a ratio of 1: 3 with a thickness of 20-30 mm (cement mortar is prepared at the work site). A curb and a sand trap are installed together in the wet cement slurry in the design position, using a tracing string and a building level. The upper surface of the grit trap should be flush with the upper surface of the soft collapsible attachment of the soft curb. 5. The curb and sand trap are fixed with cement mortar - the caulking height is 30-50 mm. The cross-sectional shape of the caulking is triangular. 6. The concreting of the side parts is carried out with the concrete mixture B25 F200, W6, P4. The concrete mix is laid without breaks, with a consistent laying direction in one direction. The concrete mix is compacted by bayonetting, followed by leveling and grouting the surface of the laid mix. The width of the side parts of the concrete frame is specified in clause 1.
Download instructions for arranging a jump pit: General instructions for arranging a jump pit Download installation example: Running track / sand pit class A 15 Download installation example: Running track / sand pit class A 15 |
|||||||||||||||
Hauraton SPORTFIX Soft kerbs, black, 500x60x400 mm (price on request) [Code number: 7224]
Details
|
7224 | ||||||||||||||
Application purpose:
Characteristics:
Installation diagram of sand traps and soft curbs for the option of installing sand traps in two rows Installation diagram of sand traps and soft curbs for the option of installing sand traps in one row General installation guidelines 1. The size of the concrete casing indicated in the drawings:
The depth of the trench from the design position of the upper layer of the sports covering to the upper layer of the frost-resistant layer:
2. Install the tracing line in accordance with the level, according to the project. 3. Sand traps and soft curbs are installed in a trench on a concrete base (foundation), the thickness of which should be d = 100 mm. The concrete base (foundation) is made of concrete grade B25 F200, W6, P4. The base (foundation) is equipped with a previously prepared frost-resistant layer. Temporary exposure of the foundation for 4-12 hours. 4. Equip a leveling layer of cement mortar in a ratio of 1: 3 with a thickness of 20-30 mm (cement mortar is prepared at the work site). A curb and a sand trap are installed together in the wet cement slurry in the design position, using a tracing string and a building level. The upper surface of the grit trap should be flush with the upper surface of the soft collapsible attachment of the soft curb. 5. The curb and sand trap are fixed with cement mortar - the caulking height is 30-50 mm. The cross-sectional shape of the caulking is triangular. 6. The concreting of the side parts is carried out with the concrete mixture B25 F200, W6, P4. The concrete mix is laid without breaks, with a consistent laying direction in one direction. The concrete mix is compacted by bayonetting, followed by leveling and grouting the surface of the laid mix. The width of the side parts of the concrete frame is specified in clause 1.
Download instructions for arranging a jump pit: General instructions for arranging a jump pit Download installation example: Running track / sand pit class A 15 Download installation example: Running track / sand pit class A 15 |
|||||||||||||||
Hauraton SPORTFIX Soft kerbs, angle pieces, black, 250x60x300 mm (price on request) [Code number: 7228]
Details
|
7228 | ||||||||||||||
Application purpose:
Characteristics:
Installation diagram of sand traps and soft curbs for the option of installing sand traps in two rows Installation diagram of sand traps and soft curbs for the option of installing sand traps in one row General installation guidelines 1. The size of the concrete casing indicated in the drawings:
The depth of the trench from the design position of the upper layer of the sports covering to the upper layer of the frost-resistant layer:
2. Install the tracing line in accordance with the level, according to the project. 3. Sand traps and soft curbs are installed in a trench on a concrete base (foundation), the thickness of which should be d = 100 mm. The concrete base (foundation) is made of concrete grade B25 F200, W6, P4. The base (foundation) is equipped with a previously prepared frost-resistant layer. Temporary exposure of the foundation for 4-12 hours. 4. Equip a leveling layer of cement mortar in a ratio of 1: 3 with a thickness of 20-30 mm (cement mortar is prepared at the work site). A curb and a sand trap are installed together in the wet cement slurry in the design position, using a tracing string and a building level. The upper surface of the grit trap should be flush with the upper surface of the soft collapsible attachment of the soft curb. 5. The curb and sand trap are fixed with cement mortar - the caulking height is 30-50 mm. The cross-sectional shape of the caulking is triangular. 6. The concreting of the side parts is carried out with the concrete mixture B25 F200, W6, P4. The concrete mix is laid without breaks, with a consistent laying direction in one direction. The concrete mix is compacted by bayonetting, followed by leveling and grouting the surface of the laid mix. The width of the side parts of the concrete frame is specified in clause 1.
Download instructions for arranging a jump pit: General instructions for arranging a jump pit Download installation example: Running track / sand pit class A 15 Download installation example: Running track / sand pit class A 15 |
|||||||||||||||
Hauraton SPORTFIX Soft kerbs, angle pieces, black, 250x60x400 mm (price on request) [Code number: 7229]
Details
|
7229 | ||||||||||||||
Application purpose:
Characteristics:
Installation diagram of sand traps and soft curbs for the option of installing sand traps in two rows Installation diagram of sand traps and soft curbs for the option of installing sand traps in one row General installation guidelines 1. The size of the concrete casing indicated in the drawings:
The depth of the trench from the design position of the upper layer of the sports covering to the upper layer of the frost-resistant layer:
2. Install the tracing line in accordance with the level, according to the project. 3. Sand traps and soft curbs are installed in a trench on a concrete base (foundation), the thickness of which should be d = 100 mm. The concrete base (foundation) is made of concrete grade B25 F200, W6, P4. The base (foundation) is equipped with a previously prepared frost-resistant layer. Temporary exposure of the foundation for 4-12 hours. 4. Equip a leveling layer of cement mortar in a ratio of 1: 3 with a thickness of 20-30 mm (cement mortar is prepared at the work site). A curb and a sand trap are installed together in the wet cement slurry in the design position, using a tracing string and a building level. The upper surface of the grit trap should be flush with the upper surface of the soft collapsible attachment of the soft curb. 5. The curb and sand trap are fixed with cement mortar - the caulking height is 30-50 mm. The cross-sectional shape of the caulking is triangular. 6. The concreting of the side parts is carried out with the concrete mixture B25 F200, W6, P4. The concrete mix is laid without breaks, with a consistent laying direction in one direction. The concrete mix is compacted by bayonetting, followed by leveling and grouting the surface of the laid mix. The width of the side parts of the concrete frame is specified in clause 1.
Download instructions for arranging a jump pit: General instructions for arranging a jump pit Download installation example: Running track / sand pit class A 15 Download installation example: Running track / sand pit class A 15 |
|||||||||||||||
Hauraton SPORTFIX Soft kerbs for shot put areas, black, 1000x100x250 mm (price on request) [Code number: 7232]
Details
|
7232 | ||||||||||||||
|
|||||||||||||||
Hauraton SPORTFIX Soft kerbs for shot put areas, white, 1000x100x250 mm (price on request) [Code number: 7237]
Details
|
7237 | ||||||||||||||
|
|||||||||||||||
Hauraton SPORTFIX Kerb type PARIS with clamping strip, 1000x60x250 mm (price on request) [Code number: 7310 (H)]
Details
|
7310 (H) | ||||||||||||||
|