Logo
Ru| En
Loading

Kerbs

Hauraton borders can be divided into two types:

  • Drainage borders made of stainless or galvanized steel. Such borders are used in landscape design, road construction, as well as in other areas. They are resistant to corrosion, atmospheric influences and mechanical damage. The borders are quite flexible, thanks to which they are laid not only in a straight line, but also in a bend - this allows the use of drainage borders as decorative elements.
  • Soft curbs for sports grounds. These curbs are designed specifically for the arrangement of sports fields for installation together with sand traps. Installation is carried out in a trench on a concrete base, the curb with a sand trap is fixed with cement mortar. You can purchase all the elements for creating a soft border from us.
Photo Name Article Price
Hauraton LINEFIX STANDARD Border, made of PP, 1500x80x45 mm [Code number: 43110]
Details
43110
Hauraton LINEFIX SUPER Border, galvanised, 1500x20x175 mm [Code number: 43210]
Details
43210
Hauraton LINEFIX SUPER Border, stainless steel, 1500x20x175 mm (price on request) [Code number: 43230]
Details
43230
Hauraton SPORTFIX Soft kerbs, white, 1000x60x200 mm (price on request) [Code number: 7200]
Details
7200

Application purpose:

  • Playing field drainage
  • Playing field borders
  • Sports grounds

Installation diagram of sand traps and soft curbs for the option of installing sand traps in two rows

Installation diagram of sand traps and soft curbs for the option of installing sand traps in one row

General installation guidelines

1. The size of the concrete casing indicated in the drawings:

  • b = 100 mm;
  • d = 100 mm;
  • h = approx. 60 mm

The depth of the trench from the design position of the upper layer of the sports covering to the upper layer of the frost-resistant layer:

  • at the place where the sand trap is installed = sand trap height + 100 mm + 20-30 mm;
  • at the installation site of the soft curb = curb height + 100 mm + 20-30 mm.

2. Install the tracing line in accordance with the level, according to the project.

3. Sand traps and soft curbs are installed in a trench on a concrete base (foundation), the thickness of which should be d = 100 mm. The concrete base (foundation) is made of concrete grade B25 F200, W6, P4. The base (foundation) is equipped with a previously prepared frost-resistant layer. Temporary exposure of the foundation for 4-12 hours.

4. Equip a leveling layer of cement mortar in a ratio of 1: 3 with a thickness of 20-30 mm (cement mortar is prepared at the work site). A curb and a sand trap are installed together in the wet cement slurry in the design position, using a tracing string and a building level. The upper surface of the grit trap should be flush with the upper surface of the soft collapsible attachment of the soft curb.

5. The curb and sand trap are fixed with cement mortar - the caulking height is 30-50 mm. The cross-sectional shape of the caulking is triangular.

6. The concreting of the side parts is carried out with the concrete mixture B25 F200, W6, P4.

The concrete mix is ​​laid without breaks, with a consistent laying direction in one direction. The concrete mix is ​​compacted by bayonetting, followed by leveling and grouting the surface of the laid mix. The width of the side parts of the concrete frame is specified in clause 1.

Length Width Height Weight
mm mm mm kg
1000 60 200 26,04

Download instructions for arranging a jump pit: 7740 (H) General instructions for arranging a jump pit

Download installation example: 7200 Running track / sand pit class A 15

Download installation example: 7200 Running track / sand pit class A 15

Hauraton SPORTFIX Soft kerbs, white, 1000x60x250 mm (price on request) [Code number: 7201]
Details
7201

Application purpose:

  • Playing field drainage
  • Playing field borders
  • Sports grounds

Installation diagram of sand traps and soft curbs for the option of installing sand traps in two rows

Installation diagram of sand traps and soft curbs for the option of installing sand traps in one row

General installation guidelines

1. The size of the concrete casing indicated in the drawings:

  • b = 100 mm;
  • d = 100 mm;
  • h = approx. 60 mm

The depth of the trench from the design position of the upper layer of the sports covering to the upper layer of the frost-resistant layer:

  • at the place where the sand trap is installed = sand trap height + 100 mm + 20-30 mm;
  • at the installation site of the soft curb = curb height + 100 mm + 20-30 mm.

2. Install the tracing line in accordance with the level, according to the project.

3. Sand traps and soft curbs are installed in a trench on a concrete base (foundation), the thickness of which should be d = 100 mm. The concrete base (foundation) is made of concrete grade B25 F200, W6, P4. The base (foundation) is equipped with a previously prepared frost-resistant layer. Temporary exposure of the foundation for 4-12 hours.

4. Equip a leveling layer of cement mortar in a ratio of 1: 3 with a thickness of 20-30 mm (cement mortar is prepared at the work site). A curb and a sand trap are installed together in the wet cement slurry in the design position, using a tracing string and a building level. The upper surface of the grit trap should be flush with the upper surface of the soft collapsible attachment of the soft curb.

5. The curb and sand trap are fixed with cement mortar - the caulking height is 30-50 mm. The cross-sectional shape of the caulking is triangular.

6. The concreting of the side parts is carried out with the concrete mixture B25 F200, W6, P4.

The concrete mix is ​​laid without breaks, with a consistent laying direction in one direction. The concrete mix is ​​compacted by bayonetting, followed by leveling and grouting the surface of the laid mix. The width of the side parts of the concrete frame is specified in clause 1.

Length Width Height Weight
mm mm mm kg
1000 60 250 33,12

Download instructions for arranging a jump pit: 7740 (H) General instructions for arranging a jump pit

Download installation example: 7201 Running track / sand pit class A 15

Download installation example: 7201 Running track / sand pit class A 15

Hauraton SPORTFIX Soft kerbs, white, 1000x60x300 mm (price on request) [Code number: 7202]
Details
7202

Application purpose:

  • Playing field drainage
  • Playing field borders
  • Sports grounds

Installation diagram of sand traps and soft curbs for the option of installing sand traps in two rows

Installation diagram of sand traps and soft curbs for the option of installing sand traps in one row

General installation guidelines

1. The size of the concrete casing indicated in the drawings:

  • b = 100 mm;
  • d = 100 mm;
  • h = approx. 60 mm

The depth of the trench from the design position of the upper layer of the sports covering to the upper layer of the frost-resistant layer:

  • at the place where the sand trap is installed = sand trap height + 100 mm + 20-30 mm;
  • at the installation site of the soft curb = curb height + 100 mm + 20-30 mm.

2. Install the tracing line in accordance with the level, according to the project.

3. Sand traps and soft curbs are installed in a trench on a concrete base (foundation), the thickness of which should be d = 100 mm. The concrete base (foundation) is made of concrete grade B25 F200, W6, P4. The base (foundation) is equipped with a previously prepared frost-resistant layer. Temporary exposure of the foundation for 4-12 hours.

4. Equip a leveling layer of cement mortar in a ratio of 1: 3 with a thickness of 20-30 mm (cement mortar is prepared at the work site). A curb and a sand trap are installed together in the wet cement slurry in the design position, using a tracing string and a building level. The upper surface of the grit trap should be flush with the upper surface of the soft collapsible attachment of the soft curb.

5. The curb and sand trap are fixed with cement mortar - the caulking height is 30-50 mm. The cross-sectional shape of the caulking is triangular.

6. The concreting of the side parts is carried out with the concrete mixture B25 F200, W6, P4.

The concrete mix is ​​laid without breaks, with a consistent laying direction in one direction. The concrete mix is ​​compacted by bayonetting, followed by leveling and grouting the surface of the laid mix. The width of the side parts of the concrete frame is specified in clause 1.

Length Width Height Weight
mm mm mm kg
1000 60 300 39,62

Download instructions for arranging a jump pit: 7740 (H) General instructions for arranging a jump pit

Download installation example: 7202 Running track / sand pit class A 15

Download installation example: 7202 Running track / sand pit class A 15

Hauraton SPORTFIX Soft kerbs, white, 1000x60x400 mm (price on request) [Code number: 7203]
Details
7203

Application purpose:

  • Playing field drainage
  • Playing field borders
  • Sports grounds

Installation diagram of sand traps and soft curbs for the option of installing sand traps in two rows

Installation diagram of sand traps and soft curbs for the option of installing sand traps in one row

General installation guidelines

1. The size of the concrete casing indicated in the drawings:

  • b = 100 mm;
  • d = 100 mm;
  • h = approx. 60 mm

The depth of the trench from the design position of the upper layer of the sports covering to the upper layer of the frost-resistant layer:

  • at the place where the sand trap is installed = sand trap height + 100 mm + 20-30 mm;
  • at the installation site of the soft curb = curb height + 100 mm + 20-30 mm.

2. Install the tracing line in accordance with the level, according to the project.

3. Sand traps and soft curbs are installed in a trench on a concrete base (foundation), the thickness of which should be d = 100 mm. The concrete base (foundation) is made of concrete grade B25 F200, W6, P4. The base (foundation) is equipped with a previously prepared frost-resistant layer. Temporary exposure of the foundation for 4-12 hours.

4. Equip a leveling layer of cement mortar in a ratio of 1: 3 with a thickness of 20-30 mm (cement mortar is prepared at the work site). A curb and a sand trap are installed together in the wet cement slurry in the design position, using a tracing string and a building level. The upper surface of the grit trap should be flush with the upper surface of the soft collapsible attachment of the soft curb.

5. The curb and sand trap are fixed with cement mortar - the caulking height is 30-50 mm. The cross-sectional shape of the caulking is triangular.

6. The concreting of the side parts is carried out with the concrete mixture B25 F200, W6, P4.

The concrete mix is ​​laid without breaks, with a consistent laying direction in one direction. The concrete mix is ​​compacted by bayonetting, followed by leveling and grouting the surface of the laid mix. The width of the side parts of the concrete frame is specified in clause 1.

Length Width Height Weight
mm mm mm kg
1000 60 400 53,00

Download instructions for arranging a jump pit: 7740 (H) General instructions for arranging a jump pit

Download installation example: 7203 Running track / sand pit class A 15

Download installation example: 7203 Running track / sand pit class A 15

Hauraton SPORTFIX Soft kerbs, white, 500x60x400 mm (price on request) [Code number: 7204]
Details
7204

Application purpose:

  • Playing field drainage
  • Playing field borders
  • Sports grounds

Installation diagram of sand traps and soft curbs for the option of installing sand traps in two rows

Installation diagram of sand traps and soft curbs for the option of installing sand traps in one row

General installation guidelines

1. The size of the concrete casing indicated in the drawings:

  • b = 100 mm;
  • d = 100 mm;
  • h = approx. 60 mm

The depth of the trench from the design position of the upper layer of the sports covering to the upper layer of the frost-resistant layer:

  • at the place where the sand trap is installed = sand trap height + 100 mm + 20-30 mm;
  • at the installation site of the soft curb = curb height + 100 mm + 20-30 mm.

2. Install the tracing line in accordance with the level, according to the project.

3. Sand traps and soft curbs are installed in a trench on a concrete base (foundation), the thickness of which should be d = 100 mm. The concrete base (foundation) is made of concrete grade B25 F200, W6, P4. The base (foundation) is equipped with a previously prepared frost-resistant layer. Temporary exposure of the foundation for 4-12 hours.

4. Equip a leveling layer of cement mortar in a ratio of 1: 3 with a thickness of 20-30 mm (cement mortar is prepared at the work site). A curb and a sand trap are installed together in the wet cement slurry in the design position, using a tracing string and a building level. The upper surface of the grit trap should be flush with the upper surface of the soft collapsible attachment of the soft curb.

5. The curb and sand trap are fixed with cement mortar - the caulking height is 30-50 mm. The cross-sectional shape of the caulking is triangular.

6. The concreting of the side parts is carried out with the concrete mixture B25 F200, W6, P4.

The concrete mix is ​​laid without breaks, with a consistent laying direction in one direction. The concrete mix is ​​compacted by bayonetting, followed by leveling and grouting the surface of the laid mix. The width of the side parts of the concrete frame is specified in clause 1.

Length Width Height Weight
mm mm mm kg
500 60 400 25,60

Download instructions for arranging a jump pit: 7740 (H) General instructions for arranging a jump pit

Download installation example: 7204 Running track / sand pit class A 15

Download installation example: 7204 Running track / sand pit class A 15

Hauraton SPORTFIX Soft kerbs, angle pieces, white, 250x60x300 mm (price on request) [Code number: 7208]
Details
7208

Application purpose:

  • Playing field drainage
  • Playing field borders
  • Sports grounds

Installation diagram of sand traps and soft curbs for the option of installing sand traps in two rows

Installation diagram of sand traps and soft curbs for the option of installing sand traps in one row

General installation guidelines

1. The size of the concrete casing indicated in the drawings:

  • b = 100 mm;
  • d = 100 mm;
  • h = approx. 60 mm

The depth of the trench from the design position of the upper layer of the sports covering to the upper layer of the frost-resistant layer:

  • at the place where the sand trap is installed = sand trap height + 100 mm + 20-30 mm;
  • at the installation site of the soft curb = curb height + 100 mm + 20-30 mm.

2. Install the tracing line in accordance with the level, according to the project.

3. Sand traps and soft curbs are installed in a trench on a concrete base (foundation), the thickness of which should be d = 100 mm. The concrete base (foundation) is made of concrete grade B25 F200, W6, P4. The base (foundation) is equipped with a previously prepared frost-resistant layer. Temporary exposure of the foundation for 4-12 hours.

4. Equip a leveling layer of cement mortar in a ratio of 1: 3 with a thickness of 20-30 mm (cement mortar is prepared at the work site). A curb and a sand trap are installed together in the wet cement slurry in the design position, using a tracing string and a building level. The upper surface of the grit trap should be flush with the upper surface of the soft collapsible attachment of the soft curb.

5. The curb and sand trap are fixed with cement mortar - the caulking height is 30-50 mm. The cross-sectional shape of the caulking is triangular.

6. The concreting of the side parts is carried out with the concrete mixture B25 F200, W6, P4.

The concrete mix is ​​laid without breaks, with a consistent laying direction in one direction. The concrete mix is ​​compacted by bayonetting, followed by leveling and grouting the surface of the laid mix. The width of the side parts of the concrete frame is specified in clause 1.

Length Width Height Weight
mm mm mm kg
250 60 300 18,00

Download instructions for arranging a jump pit: 7740 (H) General instructions for arranging a jump pit

Download installation example: 7208 Running track / sand pit class A 15

Download installation example: 7208 Running track / sand pit class A 15

Hauraton SPORTFIX Soft kerbs, angle pieces, white, 250x60x400 mm (price on request) [Code number: 7209]
Details
7209

Application purpose:

  • Playing field drainage
  • Playing field borders
  • Sports grounds

Installation diagram of sand traps and soft curbs for the option of installing sand traps in two rows

Installation diagram of sand traps and soft curbs for the option of installing sand traps in one row

General installation guidelines

1. The size of the concrete casing indicated in the drawings:

  • b = 100 mm;
  • d = 100 mm;
  • h = approx. 60 mm

The depth of the trench from the design position of the upper layer of the sports covering to the upper layer of the frost-resistant layer:

  • at the place where the sand trap is installed = sand trap height + 100 mm + 20-30 mm;
  • at the installation site of the soft curb = curb height + 100 mm + 20-30 mm.

2. Install the tracing line in accordance with the level, according to the project.

3. Sand traps and soft curbs are installed in a trench on a concrete base (foundation), the thickness of which should be d = 100 mm. The concrete base (foundation) is made of concrete grade B25 F200, W6, P4. The base (foundation) is equipped with a previously prepared frost-resistant layer. Temporary exposure of the foundation for 4-12 hours.

4. Equip a leveling layer of cement mortar in a ratio of 1: 3 with a thickness of 20-30 mm (cement mortar is prepared at the work site). A curb and a sand trap are installed together in the wet cement slurry in the design position, using a tracing string and a building level. The upper surface of the grit trap should be flush with the upper surface of the soft collapsible attachment of the soft curb.

5. The curb and sand trap are fixed with cement mortar - the caulking height is 30-50 mm. The cross-sectional shape of the caulking is triangular.

6. The concreting of the side parts is carried out with the concrete mixture B25 F200, W6, P4.

The concrete mix is ​​laid without breaks, with a consistent laying direction in one direction. The concrete mix is ​​compacted by bayonetting, followed by leveling and grouting the surface of the laid mix. The width of the side parts of the concrete frame is specified in clause 1.

Length Width Height Weight
mm mm mm kg
250 60 400 23,00

Download instructions for arranging a jump pit: 7740 (H) General instructions for arranging a jump pit

Download installation example: 7209 Running track / sand pit class A 15

Download installation example: 7209 Running track / sand pit class A 15

Hauraton SPORTFIX Soft kerbs, black, 1000x60x200 mm (price on request) [Code number: 7220]
Details
7220

Application purpose:

  • Playing field drainage
  • Playing field borders
  • Sports grounds

Characteristics:

  • Color: black

Installation diagram of sand traps and soft curbs for the option of installing sand traps in two rows

Installation diagram of sand traps and soft curbs for the option of installing sand traps in one row

General installation guidelines

1. The size of the concrete casing indicated in the drawings:

  • b = 100 mm;
  • d = 100 mm;
  • h = approx. 60 mm

The depth of the trench from the design position of the upper layer of the sports covering to the upper layer of the frost-resistant layer:

  • at the place where the sand trap is installed = sand trap height + 100 mm + 20-30 mm;
  • at the installation site of the soft curb = curb height + 100 mm + 20-30 mm.

2. Install the tracing line in accordance with the level, according to the project.

3. Sand traps and soft curbs are installed in a trench on a concrete base (foundation), the thickness of which should be d = 100 mm. The concrete base (foundation) is made of concrete grade B25 F200, W6, P4. The base (foundation) is equipped with a previously prepared frost-resistant layer. Temporary exposure of the foundation for 4-12 hours.

4. Equip a leveling layer of cement mortar in a ratio of 1: 3 with a thickness of 20-30 mm (cement mortar is prepared at the work site). A curb and a sand trap are installed together in the wet cement slurry in the design position, using a tracing string and a building level. The upper surface of the grit trap should be flush with the upper surface of the soft collapsible attachment of the soft curb.

5. The curb and sand trap are fixed with cement mortar - the caulking height is 30-50 mm. The cross-sectional shape of the caulking is triangular.

6. The concreting of the side parts is carried out with the concrete mixture B25 F200, W6, P4.

The concrete mix is ​​laid without breaks, with a consistent laying direction in one direction. The concrete mix is ​​compacted by bayonetting, followed by leveling and grouting the surface of the laid mix. The width of the side parts of the concrete frame is specified in clause 1.

Length Width Height Weight
mm mm mm kg
1000 60 200 25,87

Download instructions for arranging a jump pit: 7740 (H) General instructions for arranging a jump pit

Download installation example: 7740 (H) Running track / sand pit class A 15

Download installation example: 7740 (H) Running track / sand pit class A 15

Hauraton SPORTFIX Soft kerbs, black, 1000x60x250 mm (price on request) [Code number: 7221]
Details
7221

Application purpose:

  • Playing field drainage
  • Playing field borders
  • Sports grounds

Characteristics:

  • Color: black

Installation diagram of sand traps and soft curbs for the option of installing sand traps in two rows

Installation diagram of sand traps and soft curbs for the option of installing sand traps in one row

General installation guidelines

1. The size of the concrete casing indicated in the drawings:

  • b = 100 mm;
  • d = 100 mm;
  • h = approx. 60 mm

The depth of the trench from the design position of the upper layer of the sports covering to the upper layer of the frost-resistant layer:

  • at the place where the sand trap is installed = sand trap height + 100 mm + 20-30 mm;
  • at the installation site of the soft curb = curb height + 100 mm + 20-30 mm.

2. Install the tracing line in accordance with the level, according to the project.

3. Sand traps and soft curbs are installed in a trench on a concrete base (foundation), the thickness of which should be d = 100 mm. The concrete base (foundation) is made of concrete grade B25 F200, W6, P4. The base (foundation) is equipped with a previously prepared frost-resistant layer. Temporary exposure of the foundation for 4-12 hours.

4. Equip a leveling layer of cement mortar in a ratio of 1: 3 with a thickness of 20-30 mm (cement mortar is prepared at the work site). A curb and a sand trap are installed together in the wet cement slurry in the design position, using a tracing string and a building level. The upper surface of the grit trap should be flush with the upper surface of the soft collapsible attachment of the soft curb.

5. The curb and sand trap are fixed with cement mortar - the caulking height is 30-50 mm. The cross-sectional shape of the caulking is triangular.

6. The concreting of the side parts is carried out with the concrete mixture B25 F200, W6, P4.

The concrete mix is ​​laid without breaks, with a consistent laying direction in one direction. The concrete mix is ​​compacted by bayonetting, followed by leveling and grouting the surface of the laid mix. The width of the side parts of the concrete frame is specified in clause 1.

Length Width Height Weight
mm mm mm kg
1000 60 250 33,01

Download instructions for arranging a jump pit: 7740 (H) General instructions for arranging a jump pit

Download installation example: 7221 Running track / sand pit class A 15

Download installation example: 7221 Running track / sand pit class A 15

Hauraton SPORTFIX Soft kerbs, black, 1000x60x300 mm (price on request) [Code number: 7222]
Details
7222

Application purpose:

  • Playing field drainage
  • Playing field borders
  • Sports grounds

Characteristics:

  • Color: black

Installation diagram of sand traps and soft curbs for the option of installing sand traps in two rows

Installation diagram of sand traps and soft curbs for the option of installing sand traps in one row

General installation guidelines

1. The size of the concrete casing indicated in the drawings:

  • b = 100 mm;
  • d = 100 mm;
  • h = approx. 60 mm

The depth of the trench from the design position of the upper layer of the sports covering to the upper layer of the frost-resistant layer:

  • at the place where the sand trap is installed = sand trap height + 100 mm + 20-30 mm;
  • at the installation site of the soft curb = curb height + 100 mm + 20-30 mm.

2. Install the tracing line in accordance with the level, according to the project.

3. Sand traps and soft curbs are installed in a trench on a concrete base (foundation), the thickness of which should be d = 100 mm. The concrete base (foundation) is made of concrete grade B25 F200, W6, P4. The base (foundation) is equipped with a previously prepared frost-resistant layer. Temporary exposure of the foundation for 4-12 hours.

4. Equip a leveling layer of cement mortar in a ratio of 1: 3 with a thickness of 20-30 mm (cement mortar is prepared at the work site). A curb and a sand trap are installed together in the wet cement slurry in the design position, using a tracing string and a building level. The upper surface of the grit trap should be flush with the upper surface of the soft collapsible attachment of the soft curb.

5. The curb and sand trap are fixed with cement mortar - the caulking height is 30-50 mm. The cross-sectional shape of the caulking is triangular.

6. The concreting of the side parts is carried out with the concrete mixture B25 F200, W6, P4.

The concrete mix is ​​laid without breaks, with a consistent laying direction in one direction. The concrete mix is ​​compacted by bayonetting, followed by leveling and grouting the surface of the laid mix. The width of the side parts of the concrete frame is specified in clause 1.

Length Width Height Weight
mm mm mm kg
1000 60 300 38,90

Download instructions for arranging a jump pit: 7740 (H) General instructions for arranging a jump pit

Download installation example: 7222 Running track / sand pit class A 15

Download installation example: 7222 Running track / sand pit class A 15

Hauraton SPORTFIX Soft kerbs, black, 1000x60x400 mm (price on request) [Code number: 7223]
Details
7223

Application purpose:

  • Playing field drainage
  • Playing field borders
  • Sports grounds

Characteristics:

  • Color: black

Installation diagram of sand traps and soft curbs for the option of installing sand traps in two rows

Installation diagram of sand traps and soft curbs for the option of installing sand traps in one row

General installation guidelines

1. The size of the concrete casing indicated in the drawings:

  • b = 100 mm;
  • d = 100 mm;
  • h = approx. 60 mm

The depth of the trench from the design position of the upper layer of the sports covering to the upper layer of the frost-resistant layer:

  • at the place where the sand trap is installed = sand trap height + 100 mm + 20-30 mm;
  • at the installation site of the soft curb = curb height + 100 mm + 20-30 mm.

2. Install the tracing line in accordance with the level, according to the project.

3. Sand traps and soft curbs are installed in a trench on a concrete base (foundation), the thickness of which should be d = 100 mm. The concrete base (foundation) is made of concrete grade B25 F200, W6, P4. The base (foundation) is equipped with a previously prepared frost-resistant layer. Temporary exposure of the foundation for 4-12 hours.

4. Equip a leveling layer of cement mortar in a ratio of 1: 3 with a thickness of 20-30 mm (cement mortar is prepared at the work site). A curb and a sand trap are installed together in the wet cement slurry in the design position, using a tracing string and a building level. The upper surface of the grit trap should be flush with the upper surface of the soft collapsible attachment of the soft curb.

5. The curb and sand trap are fixed with cement mortar - the caulking height is 30-50 mm. The cross-sectional shape of the caulking is triangular.

6. The concreting of the side parts is carried out with the concrete mixture B25 F200, W6, P4.

The concrete mix is ​​laid without breaks, with a consistent laying direction in one direction. The concrete mix is ​​compacted by bayonetting, followed by leveling and grouting the surface of the laid mix. The width of the side parts of the concrete frame is specified in clause 1.

Length Width Height Weight
mm mm mm kg
1000 60 400 53,20

Download instructions for arranging a jump pit: 7740 (H) General instructions for arranging a jump pit

Download installation example: 7223 Running track / sand pit class A 15

Download installation example: 7223 Running track / sand pit class A 15

Hauraton SPORTFIX Soft kerbs, black, 500x60x400 mm (price on request) [Code number: 7224]
Details
7224

Application purpose:

  • Playing field drainage
  • Playing field borders
  • Sports grounds

Characteristics:

  • Color: black

Installation diagram of sand traps and soft curbs for the option of installing sand traps in two rows

Installation diagram of sand traps and soft curbs for the option of installing sand traps in one row

General installation guidelines

1. The size of the concrete casing indicated in the drawings:

  • b = 100 mm;
  • d = 100 mm;
  • h = approx. 60 mm

The depth of the trench from the design position of the upper layer of the sports covering to the upper layer of the frost-resistant layer:

  • at the place where the sand trap is installed = sand trap height + 100 mm + 20-30 mm;
  • at the installation site of the soft curb = curb height + 100 mm + 20-30 mm.

2. Install the tracing line in accordance with the level, according to the project.

3. Sand traps and soft curbs are installed in a trench on a concrete base (foundation), the thickness of which should be d = 100 mm. The concrete base (foundation) is made of concrete grade B25 F200, W6, P4. The base (foundation) is equipped with a previously prepared frost-resistant layer. Temporary exposure of the foundation for 4-12 hours.

4. Equip a leveling layer of cement mortar in a ratio of 1: 3 with a thickness of 20-30 mm (cement mortar is prepared at the work site). A curb and a sand trap are installed together in the wet cement slurry in the design position, using a tracing string and a building level. The upper surface of the grit trap should be flush with the upper surface of the soft collapsible attachment of the soft curb.

5. The curb and sand trap are fixed with cement mortar - the caulking height is 30-50 mm. The cross-sectional shape of the caulking is triangular.

6. The concreting of the side parts is carried out with the concrete mixture B25 F200, W6, P4.

The concrete mix is ​​laid without breaks, with a consistent laying direction in one direction. The concrete mix is ​​compacted by bayonetting, followed by leveling and grouting the surface of the laid mix. The width of the side parts of the concrete frame is specified in clause 1.

Length Width Height Weight
mm mm mm kg
500 60 400 25,20

Download instructions for arranging a jump pit: 7740 (H) General instructions for arranging a jump pit

Download installation example: 7224 Running track / sand pit class A 15

Download installation example: 7224 Running track / sand pit class A 15

Hauraton SPORTFIX Soft kerbs, angle pieces, black, 250x60x300 mm (price on request) [Code number: 7228]
Details
7228

Application purpose:

  • Playing field drainage
  • Playing field borders
  • Sports grounds

Characteristics:

  • Color: black

Installation diagram of sand traps and soft curbs for the option of installing sand traps in two rows

Installation diagram of sand traps and soft curbs for the option of installing sand traps in one row

General installation guidelines

1. The size of the concrete casing indicated in the drawings:

  • b = 100 mm;
  • d = 100 mm;
  • h = approx. 60 mm

The depth of the trench from the design position of the upper layer of the sports covering to the upper layer of the frost-resistant layer:

  • at the place where the sand trap is installed = sand trap height + 100 mm + 20-30 mm;
  • at the installation site of the soft curb = curb height + 100 mm + 20-30 mm.

2. Install the tracing line in accordance with the level, according to the project.

3. Sand traps and soft curbs are installed in a trench on a concrete base (foundation), the thickness of which should be d = 100 mm. The concrete base (foundation) is made of concrete grade B25 F200, W6, P4. The base (foundation) is equipped with a previously prepared frost-resistant layer. Temporary exposure of the foundation for 4-12 hours.

4. Equip a leveling layer of cement mortar in a ratio of 1: 3 with a thickness of 20-30 mm (cement mortar is prepared at the work site). A curb and a sand trap are installed together in the wet cement slurry in the design position, using a tracing string and a building level. The upper surface of the grit trap should be flush with the upper surface of the soft collapsible attachment of the soft curb.

5. The curb and sand trap are fixed with cement mortar - the caulking height is 30-50 mm. The cross-sectional shape of the caulking is triangular.

6. The concreting of the side parts is carried out with the concrete mixture B25 F200, W6, P4.

The concrete mix is ​​laid without breaks, with a consistent laying direction in one direction. The concrete mix is ​​compacted by bayonetting, followed by leveling and grouting the surface of the laid mix. The width of the side parts of the concrete frame is specified in clause 1.

Length Width Height Weight
mm mm mm kg
250 60 300 16,40

Download instructions for arranging a jump pit: 7740 (H) General instructions for arranging a jump pit

Download installation example: 7228 Running track / sand pit class A 15

Download installation example: 7228 Running track / sand pit class A 15

Hauraton SPORTFIX Soft kerbs, angle pieces, black, 250x60x400 mm (price on request) [Code number: 7229]
Details
7229

Application purpose:

  • Playing field drainage
  • Playing field borders
  • Sports grounds

Characteristics:

  • Color: black

Installation diagram of sand traps and soft curbs for the option of installing sand traps in two rows

Installation diagram of sand traps and soft curbs for the option of installing sand traps in one row

General installation guidelines

1. The size of the concrete casing indicated in the drawings:

  • b = 100 mm;
  • d = 100 mm;
  • h = approx. 60 mm

The depth of the trench from the design position of the upper layer of the sports covering to the upper layer of the frost-resistant layer:

  • at the place where the sand trap is installed = sand trap height + 100 mm + 20-30 mm;
  • at the installation site of the soft curb = curb height + 100 mm + 20-30 mm.

2. Install the tracing line in accordance with the level, according to the project.

3. Sand traps and soft curbs are installed in a trench on a concrete base (foundation), the thickness of which should be d = 100 mm. The concrete base (foundation) is made of concrete grade B25 F200, W6, P4. The base (foundation) is equipped with a previously prepared frost-resistant layer. Temporary exposure of the foundation for 4-12 hours.

4. Equip a leveling layer of cement mortar in a ratio of 1: 3 with a thickness of 20-30 mm (cement mortar is prepared at the work site). A curb and a sand trap are installed together in the wet cement slurry in the design position, using a tracing string and a building level. The upper surface of the grit trap should be flush with the upper surface of the soft collapsible attachment of the soft curb.

5. The curb and sand trap are fixed with cement mortar - the caulking height is 30-50 mm. The cross-sectional shape of the caulking is triangular.

6. The concreting of the side parts is carried out with the concrete mixture B25 F200, W6, P4.

The concrete mix is ​​laid without breaks, with a consistent laying direction in one direction. The concrete mix is ​​compacted by bayonetting, followed by leveling and grouting the surface of the laid mix. The width of the side parts of the concrete frame is specified in clause 1.

Length Width Height Weight
mm mm mm kg
250 60 400 28,61

Download instructions for arranging a jump pit: 7740 (H) General instructions for arranging a jump pit

Download installation example: 7229 Running track / sand pit class A 15

Download installation example: 7229 Running track / sand pit class A 15

Hauraton SPORTFIX Soft kerbs for shot put areas, black, 1000x100x250 mm (price on request) [Code number: 7232]
Details
7232
Hauraton SPORTFIX Soft kerbs for shot put areas, white, 1000x100x250 mm (price on request) [Code number: 7237]
Details
7237
Hauraton SPORTFIX Kerb type PARIS with clamping strip, 1000x60x250 mm (price on request) [Code number: 7310 (H)]
Details
7310 (H)