The drainage system is an important part of any personal plot, as it is responsible for draining excess water from the territory, protecting the foundation and basement of the house from the negative effects of water, namely from the formation of mold in the premises and partial or even complete destruction of the foundation. Also, drainage systems play a huge role in the improvement of any settlement.
Our company offers a wide range of products for the installation of drainage systems:
In addition, we will deliver the ordered products to any region of Russia, and our managers will help you choose the most optimal elements for the drainage system for your project! There is a flexible system of discounts!
Photo | Name | Article | Price | |||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Hauraton SPORTFIX Soft kerbs, black, 1000x60x300 mm (price on request) [Code number: 7222]
Details
|
7222 | |||||||||||||||||
Application purpose:
Characteristics:
Installation diagram of sand traps and soft curbs for the option of installing sand traps in two rows Installation diagram of sand traps and soft curbs for the option of installing sand traps in one row General installation guidelines 1. The size of the concrete casing indicated in the drawings:
The depth of the trench from the design position of the upper layer of the sports covering to the upper layer of the frost-resistant layer:
2. Install the tracing line in accordance with the level, according to the project. 3. Sand traps and soft curbs are installed in a trench on a concrete base (foundation), the thickness of which should be d = 100 mm. The concrete base (foundation) is made of concrete grade B25 F200, W6, P4. The base (foundation) is equipped with a previously prepared frost-resistant layer. Temporary exposure of the foundation for 4-12 hours. 4. Equip a leveling layer of cement mortar in a ratio of 1: 3 with a thickness of 20-30 mm (cement mortar is prepared at the work site). A curb and a sand trap are installed together in the wet cement slurry in the design position, using a tracing string and a building level. The upper surface of the grit trap should be flush with the upper surface of the soft collapsible attachment of the soft curb. 5. The curb and sand trap are fixed with cement mortar - the caulking height is 30-50 mm. The cross-sectional shape of the caulking is triangular. 6. The concreting of the side parts is carried out with the concrete mixture B25 F200, W6, P4. The concrete mix is laid without breaks, with a consistent laying direction in one direction. The concrete mix is compacted by bayonetting, followed by leveling and grouting the surface of the laid mix. The width of the side parts of the concrete frame is specified in clause 1.
Download instructions for arranging a jump pit: General instructions for arranging a jump pit Download installation example: Running track / sand pit class A 15 Download installation example: Running track / sand pit class A 15 |
||||||||||||||||||
Hauraton SPORTFIX Soft kerbs, black, 1000x60x400 mm (price on request) [Code number: 7223]
Details
|
7223 | |||||||||||||||||
Application purpose:
Characteristics:
Installation diagram of sand traps and soft curbs for the option of installing sand traps in two rows Installation diagram of sand traps and soft curbs for the option of installing sand traps in one row General installation guidelines 1. The size of the concrete casing indicated in the drawings:
The depth of the trench from the design position of the upper layer of the sports covering to the upper layer of the frost-resistant layer:
2. Install the tracing line in accordance with the level, according to the project. 3. Sand traps and soft curbs are installed in a trench on a concrete base (foundation), the thickness of which should be d = 100 mm. The concrete base (foundation) is made of concrete grade B25 F200, W6, P4. The base (foundation) is equipped with a previously prepared frost-resistant layer. Temporary exposure of the foundation for 4-12 hours. 4. Equip a leveling layer of cement mortar in a ratio of 1: 3 with a thickness of 20-30 mm (cement mortar is prepared at the work site). A curb and a sand trap are installed together in the wet cement slurry in the design position, using a tracing string and a building level. The upper surface of the grit trap should be flush with the upper surface of the soft collapsible attachment of the soft curb. 5. The curb and sand trap are fixed with cement mortar - the caulking height is 30-50 mm. The cross-sectional shape of the caulking is triangular. 6. The concreting of the side parts is carried out with the concrete mixture B25 F200, W6, P4. The concrete mix is laid without breaks, with a consistent laying direction in one direction. The concrete mix is compacted by bayonetting, followed by leveling and grouting the surface of the laid mix. The width of the side parts of the concrete frame is specified in clause 1.
Download instructions for arranging a jump pit: General instructions for arranging a jump pit Download installation example: Running track / sand pit class A 15 Download installation example: Running track / sand pit class A 15 |
||||||||||||||||||
Hauraton SPORTFIX Soft kerbs, black, 500x60x400 mm (price on request) [Code number: 7224]
Details
|
7224 | |||||||||||||||||
Application purpose:
Characteristics:
Installation diagram of sand traps and soft curbs for the option of installing sand traps in two rows Installation diagram of sand traps and soft curbs for the option of installing sand traps in one row General installation guidelines 1. The size of the concrete casing indicated in the drawings:
The depth of the trench from the design position of the upper layer of the sports covering to the upper layer of the frost-resistant layer:
2. Install the tracing line in accordance with the level, according to the project. 3. Sand traps and soft curbs are installed in a trench on a concrete base (foundation), the thickness of which should be d = 100 mm. The concrete base (foundation) is made of concrete grade B25 F200, W6, P4. The base (foundation) is equipped with a previously prepared frost-resistant layer. Temporary exposure of the foundation for 4-12 hours. 4. Equip a leveling layer of cement mortar in a ratio of 1: 3 with a thickness of 20-30 mm (cement mortar is prepared at the work site). A curb and a sand trap are installed together in the wet cement slurry in the design position, using a tracing string and a building level. The upper surface of the grit trap should be flush with the upper surface of the soft collapsible attachment of the soft curb. 5. The curb and sand trap are fixed with cement mortar - the caulking height is 30-50 mm. The cross-sectional shape of the caulking is triangular. 6. The concreting of the side parts is carried out with the concrete mixture B25 F200, W6, P4. The concrete mix is laid without breaks, with a consistent laying direction in one direction. The concrete mix is compacted by bayonetting, followed by leveling and grouting the surface of the laid mix. The width of the side parts of the concrete frame is specified in clause 1.
Download instructions for arranging a jump pit: General instructions for arranging a jump pit Download installation example: Running track / sand pit class A 15 Download installation example: Running track / sand pit class A 15 |
||||||||||||||||||
Hauraton SPORTFIX Soft kerbs, angle pieces, black, 250x60x300 mm (price on request) [Code number: 7228]
Details
|
7228 | |||||||||||||||||
Application purpose:
Characteristics:
Installation diagram of sand traps and soft curbs for the option of installing sand traps in two rows Installation diagram of sand traps and soft curbs for the option of installing sand traps in one row General installation guidelines 1. The size of the concrete casing indicated in the drawings:
The depth of the trench from the design position of the upper layer of the sports covering to the upper layer of the frost-resistant layer:
2. Install the tracing line in accordance with the level, according to the project. 3. Sand traps and soft curbs are installed in a trench on a concrete base (foundation), the thickness of which should be d = 100 mm. The concrete base (foundation) is made of concrete grade B25 F200, W6, P4. The base (foundation) is equipped with a previously prepared frost-resistant layer. Temporary exposure of the foundation for 4-12 hours. 4. Equip a leveling layer of cement mortar in a ratio of 1: 3 with a thickness of 20-30 mm (cement mortar is prepared at the work site). A curb and a sand trap are installed together in the wet cement slurry in the design position, using a tracing string and a building level. The upper surface of the grit trap should be flush with the upper surface of the soft collapsible attachment of the soft curb. 5. The curb and sand trap are fixed with cement mortar - the caulking height is 30-50 mm. The cross-sectional shape of the caulking is triangular. 6. The concreting of the side parts is carried out with the concrete mixture B25 F200, W6, P4. The concrete mix is laid without breaks, with a consistent laying direction in one direction. The concrete mix is compacted by bayonetting, followed by leveling and grouting the surface of the laid mix. The width of the side parts of the concrete frame is specified in clause 1.
Download instructions for arranging a jump pit: General instructions for arranging a jump pit Download installation example: Running track / sand pit class A 15 Download installation example: Running track / sand pit class A 15 |
||||||||||||||||||
Hauraton SPORTFIX Soft kerbs, angle pieces, black, 250x60x400 mm (price on request) [Code number: 7229]
Details
|
7229 | |||||||||||||||||
Application purpose:
Characteristics:
Installation diagram of sand traps and soft curbs for the option of installing sand traps in two rows Installation diagram of sand traps and soft curbs for the option of installing sand traps in one row General installation guidelines 1. The size of the concrete casing indicated in the drawings:
The depth of the trench from the design position of the upper layer of the sports covering to the upper layer of the frost-resistant layer:
2. Install the tracing line in accordance with the level, according to the project. 3. Sand traps and soft curbs are installed in a trench on a concrete base (foundation), the thickness of which should be d = 100 mm. The concrete base (foundation) is made of concrete grade B25 F200, W6, P4. The base (foundation) is equipped with a previously prepared frost-resistant layer. Temporary exposure of the foundation for 4-12 hours. 4. Equip a leveling layer of cement mortar in a ratio of 1: 3 with a thickness of 20-30 mm (cement mortar is prepared at the work site). A curb and a sand trap are installed together in the wet cement slurry in the design position, using a tracing string and a building level. The upper surface of the grit trap should be flush with the upper surface of the soft collapsible attachment of the soft curb. 5. The curb and sand trap are fixed with cement mortar - the caulking height is 30-50 mm. The cross-sectional shape of the caulking is triangular. 6. The concreting of the side parts is carried out with the concrete mixture B25 F200, W6, P4. The concrete mix is laid without breaks, with a consistent laying direction in one direction. The concrete mix is compacted by bayonetting, followed by leveling and grouting the surface of the laid mix. The width of the side parts of the concrete frame is specified in clause 1.
Download instructions for arranging a jump pit: General instructions for arranging a jump pit Download installation example: Running track / sand pit class A 15 Download installation example: Running track / sand pit class A 15 |
||||||||||||||||||
Hauraton SPORTFIX Soft kerbs for shot put areas, black, 1000x100x250 mm (price on request) [Code number: 7232]
Details
|
7232 | |||||||||||||||||
|
||||||||||||||||||
Hauraton SPORTFIX Soft kerbs for shot put areas, white, 1000x100x250 mm (price on request) [Code number: 7237]
Details
|
7237 | |||||||||||||||||
|
||||||||||||||||||
Hauraton SPORTFIX End cap for sand traps (price on request) [Code number: 7248]
Details
|
7248 | |||||||||||||||||
Application purpose:
|
||||||||||||||||||
Hauraton SPORTFIX Dish channel inlet, 600x250x543 mm (price on request) [Code number: 7250]
Details
|
7250 | |||||||||||||||||
|
||||||||||||||||||
Hauraton SPORTFIX Dish channel inlet with running track adaptor, 600x350x60 mm (price on request) [Code number: 7254]
Details
|
7254 | |||||||||||||||||
|
||||||||||||||||||
Hauraton SPORTFIX Kerb type PARIS with clamping strip, 1000x60x250 mm (price on request) [Code number: 7310 (H)]
Details
|
7310 (H) | |||||||||||||||||
|
||||||||||||||||||
Hauraton SPORTFIX Trash boxes type PARIS, 500x160x500 mm (price on request) [Code number: 7352]
Details
|
7352 | |||||||||||||||||
|
||||||||||||||||||
Hauraton SPORTFIX PRO 100 Trash box with mud bucket and GUGI-Grating made of PA-GF, MW 15/25, black, cl. B 125, locked, 500x160x504 mm (price on request) [Code number: 7515]
Details
|
7515 | |||||||||||||||||
|
||||||||||||||||||
Hauraton SPORTFIX PRO Trash box with mud bucket and FIBRETEC slotted grating, SW 9 mm, black, cl. C 250, 500x160x504 mm (price on request) [Code number: 7525]
Details
|
7525 | |||||||||||||||||
|
||||||||||||||||||
Hauraton SPORTFIX STANDARD 100 Trash box with mud bucket and slotted grating, SW 75/9, trafficable, locked, 500x150x488 mm (price on request) [Code number: 7535]
Details
|
7535 | |||||||||||||||||
|
||||||||||||||||||
Hauraton SPORTFIX Plastic cover, straight, 1000x143x50 mm (price on request) [Code number: 7560]
Details
|
7560 | |||||||||||||||||
Product description: SPORTFIX - Plastic cover made of UV resistant, break-proof plastic, white, bilateral inflow, with steel clips for fixing on open SPORTFIX channels, straight version, acc. requirements of World Athletics, LxWxH 1000x143x50 mm.
Download product data sheet: Hauraton SPORTFIX Plastic cover |
||||||||||||||||||
Hauraton SPORTFIX Plastic cover, curved, 1000x143x50 mm (price on request) [Code number: 7561]
Details
|
7561 | |||||||||||||||||
Product description: SPORTFIX Plastic cover made of UV resistant, breakproof plastic, white, bilateral inflow, with steel clips for fixing on open SPORTFIX channels, curved version r=36,5m, acc. requirements of World Athletics, LxWxH 1000x143x50 mm.
Download product data sheet: Hauraton SPORTFIX Plastic cover |
||||||||||||||||||
Hauraton SPORTFIX Plastic blind cover, straight, 1000x143x50 mm (price on request) [Code number: 7563]
Details
|
7563 | |||||||||||||||||
Set of rules:
Product description: SPORTFIX - Plastic blank cover made of UV-resistant, break-proof plastic, white, bilateral inflow, for fixing on SPORTFIX slotted channels, straight, acc. requirements of World Athletics.
Download product data sheet: Hauraton SPORTFIX Plastic blind cover, straight |
||||||||||||||||||
Hauraton SPORTFIX Plastic blind cover, curved, 1000x143x50 mm (price on request) [Code number: 7564]
Details
|
7564 | |||||||||||||||||
Set of rules:
Product description: SPORTFIX - Plastic blank cover made of UV-resistant, break-proof plastic, white, bilateral inflow, for fixing on SPORTFIX slotted channels, curved r=36,5m, r=36,50 m, acc. requirements of World Athletics.
Download product data sheet: Hauraton SPORTFIX Plastic blind cover, curved |
||||||||||||||||||
Hauraton SPORTFIX CLEAN 100 Trash box with particle catching bucket, with GUGI grating, made of PA, MW 15/25, load class B 125, 500x160x504 mm (price on request) [Code number: 7700]
Details
|
7700 | |||||||||||||||||
|