The company "Inrusstrade" specializes in the supply of high-quality pipeline products for the installation of external and internal sewer systems.
Our catalog contains products of both European and Russian manufacturers from various materials. All offered products are known for their high quality and meet all sanitary requirements.
So, the catalog contains pipes and fittings made of cast iron, polyethylene and polypropylene, steel (chromium, stainless, galvanized).
We offer all the equipment necessary for the installation of sewer systems:
All products are in stock and can be delivered to any region of Russia. For more information, call our managers.
Photo | Name | Article | Price | ||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Hauraton Installation aid NW 100 (2 pieces required) - due to security reasons no return can be made (price on request) [Code number: 705 (H)]
Details
|
705 (H) | ||||||||||||||
|
|||||||||||||||
Hauraton FASERFIX Philipp Spherical Head Lifting Clutch, 80-HKD-025, for laying trash boxes, galvanised, 2 pieces required (price on request) [Code number: 708]
Details
|
708 | ||||||||||||||
|
|||||||||||||||
Hauraton SPORTFIX set (160 pieces) for 400 m track, including fixing material (price on request) [Code number: 7085]
Details
|
7085 | ||||||||||||||
Material:
Product description: SPORTFIX Aluminium curbing made of anodized aluminium profiles, official track inside kerb for competitions, set for 400m track with radius 36,5m, incl. fixing material.
Download product data sheet: Hauraton SPORTFIX set |
|||||||||||||||
Hauraton SPORTFIX Type PARIS installation kit (price on request) [Code number: 715]
Details
|
715 | ||||||||||||||
|
|||||||||||||||
Hauraton SPORTFIX Cover with underframe for water jump, 3656x3417x520 mm (price on request) [Code number: 7152]
Details
|
7152 | ||||||||||||||
Material:
Product description: SPORTFIX Cover for water jump with supporting construction, made of aluminium profile, can be individually coated for unobtrusive integration into the surroundings.
Download product data sheet: Hauraton SPORTFIX Cover with underframe for water jump |
|||||||||||||||
Hauraton SPORTFIX Soft kerbs, white, 1000x60x200 mm (price on request) [Code number: 7200]
Details
|
7200 | ||||||||||||||
Application purpose:
Installation diagram of sand traps and soft curbs for the option of installing sand traps in two rows Installation diagram of sand traps and soft curbs for the option of installing sand traps in one row General installation guidelines 1. The size of the concrete casing indicated in the drawings:
The depth of the trench from the design position of the upper layer of the sports covering to the upper layer of the frost-resistant layer:
2. Install the tracing line in accordance with the level, according to the project. 3. Sand traps and soft curbs are installed in a trench on a concrete base (foundation), the thickness of which should be d = 100 mm. The concrete base (foundation) is made of concrete grade B25 F200, W6, P4. The base (foundation) is equipped with a previously prepared frost-resistant layer. Temporary exposure of the foundation for 4-12 hours. 4. Equip a leveling layer of cement mortar in a ratio of 1: 3 with a thickness of 20-30 mm (cement mortar is prepared at the work site). A curb and a sand trap are installed together in the wet cement slurry in the design position, using a tracing string and a building level. The upper surface of the grit trap should be flush with the upper surface of the soft collapsible attachment of the soft curb. 5. The curb and sand trap are fixed with cement mortar - the caulking height is 30-50 mm. The cross-sectional shape of the caulking is triangular. 6. The concreting of the side parts is carried out with the concrete mixture B25 F200, W6, P4. The concrete mix is laid without breaks, with a consistent laying direction in one direction. The concrete mix is compacted by bayonetting, followed by leveling and grouting the surface of the laid mix. The width of the side parts of the concrete frame is specified in clause 1.
Download instructions for arranging a jump pit: General instructions for arranging a jump pit Download installation example: Running track / sand pit class A 15 Download installation example: Running track / sand pit class A 15 |
|||||||||||||||
Hauraton SPORTFIX Soft kerbs, white, 1000x60x250 mm (price on request) [Code number: 7201]
Details
|
7201 | ||||||||||||||
Application purpose:
Installation diagram of sand traps and soft curbs for the option of installing sand traps in two rows Installation diagram of sand traps and soft curbs for the option of installing sand traps in one row General installation guidelines 1. The size of the concrete casing indicated in the drawings:
The depth of the trench from the design position of the upper layer of the sports covering to the upper layer of the frost-resistant layer:
2. Install the tracing line in accordance with the level, according to the project. 3. Sand traps and soft curbs are installed in a trench on a concrete base (foundation), the thickness of which should be d = 100 mm. The concrete base (foundation) is made of concrete grade B25 F200, W6, P4. The base (foundation) is equipped with a previously prepared frost-resistant layer. Temporary exposure of the foundation for 4-12 hours. 4. Equip a leveling layer of cement mortar in a ratio of 1: 3 with a thickness of 20-30 mm (cement mortar is prepared at the work site). A curb and a sand trap are installed together in the wet cement slurry in the design position, using a tracing string and a building level. The upper surface of the grit trap should be flush with the upper surface of the soft collapsible attachment of the soft curb. 5. The curb and sand trap are fixed with cement mortar - the caulking height is 30-50 mm. The cross-sectional shape of the caulking is triangular. 6. The concreting of the side parts is carried out with the concrete mixture B25 F200, W6, P4. The concrete mix is laid without breaks, with a consistent laying direction in one direction. The concrete mix is compacted by bayonetting, followed by leveling and grouting the surface of the laid mix. The width of the side parts of the concrete frame is specified in clause 1.
Download instructions for arranging a jump pit: General instructions for arranging a jump pit Download installation example: Running track / sand pit class A 15 Download installation example: Running track / sand pit class A 15 |
|||||||||||||||
Hauraton SPORTFIX Soft kerbs, white, 1000x60x300 mm (price on request) [Code number: 7202]
Details
|
7202 | ||||||||||||||
Application purpose:
Installation diagram of sand traps and soft curbs for the option of installing sand traps in two rows Installation diagram of sand traps and soft curbs for the option of installing sand traps in one row General installation guidelines 1. The size of the concrete casing indicated in the drawings:
The depth of the trench from the design position of the upper layer of the sports covering to the upper layer of the frost-resistant layer:
2. Install the tracing line in accordance with the level, according to the project. 3. Sand traps and soft curbs are installed in a trench on a concrete base (foundation), the thickness of which should be d = 100 mm. The concrete base (foundation) is made of concrete grade B25 F200, W6, P4. The base (foundation) is equipped with a previously prepared frost-resistant layer. Temporary exposure of the foundation for 4-12 hours. 4. Equip a leveling layer of cement mortar in a ratio of 1: 3 with a thickness of 20-30 mm (cement mortar is prepared at the work site). A curb and a sand trap are installed together in the wet cement slurry in the design position, using a tracing string and a building level. The upper surface of the grit trap should be flush with the upper surface of the soft collapsible attachment of the soft curb. 5. The curb and sand trap are fixed with cement mortar - the caulking height is 30-50 mm. The cross-sectional shape of the caulking is triangular. 6. The concreting of the side parts is carried out with the concrete mixture B25 F200, W6, P4. The concrete mix is laid without breaks, with a consistent laying direction in one direction. The concrete mix is compacted by bayonetting, followed by leveling and grouting the surface of the laid mix. The width of the side parts of the concrete frame is specified in clause 1.
Download instructions for arranging a jump pit: General instructions for arranging a jump pit Download installation example: Running track / sand pit class A 15 Download installation example: Running track / sand pit class A 15 |
|||||||||||||||
Hauraton SPORTFIX Soft kerbs, white, 1000x60x400 mm (price on request) [Code number: 7203]
Details
|
7203 | ||||||||||||||
Application purpose:
Installation diagram of sand traps and soft curbs for the option of installing sand traps in two rows Installation diagram of sand traps and soft curbs for the option of installing sand traps in one row General installation guidelines 1. The size of the concrete casing indicated in the drawings:
The depth of the trench from the design position of the upper layer of the sports covering to the upper layer of the frost-resistant layer:
2. Install the tracing line in accordance with the level, according to the project. 3. Sand traps and soft curbs are installed in a trench on a concrete base (foundation), the thickness of which should be d = 100 mm. The concrete base (foundation) is made of concrete grade B25 F200, W6, P4. The base (foundation) is equipped with a previously prepared frost-resistant layer. Temporary exposure of the foundation for 4-12 hours. 4. Equip a leveling layer of cement mortar in a ratio of 1: 3 with a thickness of 20-30 mm (cement mortar is prepared at the work site). A curb and a sand trap are installed together in the wet cement slurry in the design position, using a tracing string and a building level. The upper surface of the grit trap should be flush with the upper surface of the soft collapsible attachment of the soft curb. 5. The curb and sand trap are fixed with cement mortar - the caulking height is 30-50 mm. The cross-sectional shape of the caulking is triangular. 6. The concreting of the side parts is carried out with the concrete mixture B25 F200, W6, P4. The concrete mix is laid without breaks, with a consistent laying direction in one direction. The concrete mix is compacted by bayonetting, followed by leveling and grouting the surface of the laid mix. The width of the side parts of the concrete frame is specified in clause 1.
Download instructions for arranging a jump pit: General instructions for arranging a jump pit Download installation example: Running track / sand pit class A 15 Download installation example: Running track / sand pit class A 15 |
|||||||||||||||
Hauraton SPORTFIX Soft kerbs, white, 500x60x400 mm (price on request) [Code number: 7204]
Details
|
7204 | ||||||||||||||
Application purpose:
Installation diagram of sand traps and soft curbs for the option of installing sand traps in two rows Installation diagram of sand traps and soft curbs for the option of installing sand traps in one row General installation guidelines 1. The size of the concrete casing indicated in the drawings:
The depth of the trench from the design position of the upper layer of the sports covering to the upper layer of the frost-resistant layer:
2. Install the tracing line in accordance with the level, according to the project. 3. Sand traps and soft curbs are installed in a trench on a concrete base (foundation), the thickness of which should be d = 100 mm. The concrete base (foundation) is made of concrete grade B25 F200, W6, P4. The base (foundation) is equipped with a previously prepared frost-resistant layer. Temporary exposure of the foundation for 4-12 hours. 4. Equip a leveling layer of cement mortar in a ratio of 1: 3 with a thickness of 20-30 mm (cement mortar is prepared at the work site). A curb and a sand trap are installed together in the wet cement slurry in the design position, using a tracing string and a building level. The upper surface of the grit trap should be flush with the upper surface of the soft collapsible attachment of the soft curb. 5. The curb and sand trap are fixed with cement mortar - the caulking height is 30-50 mm. The cross-sectional shape of the caulking is triangular. 6. The concreting of the side parts is carried out with the concrete mixture B25 F200, W6, P4. The concrete mix is laid without breaks, with a consistent laying direction in one direction. The concrete mix is compacted by bayonetting, followed by leveling and grouting the surface of the laid mix. The width of the side parts of the concrete frame is specified in clause 1.
Download instructions for arranging a jump pit: General instructions for arranging a jump pit Download installation example: Running track / sand pit class A 15 Download installation example: Running track / sand pit class A 15 |
|||||||||||||||
Hauraton SPORTFIX Soft kerbs, angle pieces, white, 250x60x300 mm (price on request) [Code number: 7208]
Details
|
7208 | ||||||||||||||
Application purpose:
Installation diagram of sand traps and soft curbs for the option of installing sand traps in two rows Installation diagram of sand traps and soft curbs for the option of installing sand traps in one row General installation guidelines 1. The size of the concrete casing indicated in the drawings:
The depth of the trench from the design position of the upper layer of the sports covering to the upper layer of the frost-resistant layer:
2. Install the tracing line in accordance with the level, according to the project. 3. Sand traps and soft curbs are installed in a trench on a concrete base (foundation), the thickness of which should be d = 100 mm. The concrete base (foundation) is made of concrete grade B25 F200, W6, P4. The base (foundation) is equipped with a previously prepared frost-resistant layer. Temporary exposure of the foundation for 4-12 hours. 4. Equip a leveling layer of cement mortar in a ratio of 1: 3 with a thickness of 20-30 mm (cement mortar is prepared at the work site). A curb and a sand trap are installed together in the wet cement slurry in the design position, using a tracing string and a building level. The upper surface of the grit trap should be flush with the upper surface of the soft collapsible attachment of the soft curb. 5. The curb and sand trap are fixed with cement mortar - the caulking height is 30-50 mm. The cross-sectional shape of the caulking is triangular. 6. The concreting of the side parts is carried out with the concrete mixture B25 F200, W6, P4. The concrete mix is laid without breaks, with a consistent laying direction in one direction. The concrete mix is compacted by bayonetting, followed by leveling and grouting the surface of the laid mix. The width of the side parts of the concrete frame is specified in clause 1.
Download instructions for arranging a jump pit: General instructions for arranging a jump pit Download installation example: Running track / sand pit class A 15 Download installation example: Running track / sand pit class A 15 |
|||||||||||||||
Hauraton SPORTFIX Soft kerbs, angle pieces, white, 250x60x400 mm (price on request) [Code number: 7209]
Details
|
7209 | ||||||||||||||
Application purpose:
Installation diagram of sand traps and soft curbs for the option of installing sand traps in two rows Installation diagram of sand traps and soft curbs for the option of installing sand traps in one row General installation guidelines 1. The size of the concrete casing indicated in the drawings:
The depth of the trench from the design position of the upper layer of the sports covering to the upper layer of the frost-resistant layer:
2. Install the tracing line in accordance with the level, according to the project. 3. Sand traps and soft curbs are installed in a trench on a concrete base (foundation), the thickness of which should be d = 100 mm. The concrete base (foundation) is made of concrete grade B25 F200, W6, P4. The base (foundation) is equipped with a previously prepared frost-resistant layer. Temporary exposure of the foundation for 4-12 hours. 4. Equip a leveling layer of cement mortar in a ratio of 1: 3 with a thickness of 20-30 mm (cement mortar is prepared at the work site). A curb and a sand trap are installed together in the wet cement slurry in the design position, using a tracing string and a building level. The upper surface of the grit trap should be flush with the upper surface of the soft collapsible attachment of the soft curb. 5. The curb and sand trap are fixed with cement mortar - the caulking height is 30-50 mm. The cross-sectional shape of the caulking is triangular. 6. The concreting of the side parts is carried out with the concrete mixture B25 F200, W6, P4. The concrete mix is laid without breaks, with a consistent laying direction in one direction. The concrete mix is compacted by bayonetting, followed by leveling and grouting the surface of the laid mix. The width of the side parts of the concrete frame is specified in clause 1.
Download instructions for arranging a jump pit: General instructions for arranging a jump pit Download installation example: Running track / sand pit class A 15 Download installation example: Running track / sand pit class A 15 |
|||||||||||||||
Hauraton SPORTFIX Soft kerbs, black, 1000x60x200 mm (price on request) [Code number: 7220]
Details
|
7220 | ||||||||||||||
Application purpose:
Characteristics:
Installation diagram of sand traps and soft curbs for the option of installing sand traps in two rows Installation diagram of sand traps and soft curbs for the option of installing sand traps in one row General installation guidelines 1. The size of the concrete casing indicated in the drawings:
The depth of the trench from the design position of the upper layer of the sports covering to the upper layer of the frost-resistant layer:
2. Install the tracing line in accordance with the level, according to the project. 3. Sand traps and soft curbs are installed in a trench on a concrete base (foundation), the thickness of which should be d = 100 mm. The concrete base (foundation) is made of concrete grade B25 F200, W6, P4. The base (foundation) is equipped with a previously prepared frost-resistant layer. Temporary exposure of the foundation for 4-12 hours. 4. Equip a leveling layer of cement mortar in a ratio of 1: 3 with a thickness of 20-30 mm (cement mortar is prepared at the work site). A curb and a sand trap are installed together in the wet cement slurry in the design position, using a tracing string and a building level. The upper surface of the grit trap should be flush with the upper surface of the soft collapsible attachment of the soft curb. 5. The curb and sand trap are fixed with cement mortar - the caulking height is 30-50 mm. The cross-sectional shape of the caulking is triangular. 6. The concreting of the side parts is carried out with the concrete mixture B25 F200, W6, P4. The concrete mix is laid without breaks, with a consistent laying direction in one direction. The concrete mix is compacted by bayonetting, followed by leveling and grouting the surface of the laid mix. The width of the side parts of the concrete frame is specified in clause 1.
Download instructions for arranging a jump pit: General instructions for arranging a jump pit Download installation example: Running track / sand pit class A 15 Download installation example: Running track / sand pit class A 15 |
|||||||||||||||
Hauraton SPORTFIX Soft kerbs, black, 1000x60x250 mm (price on request) [Code number: 7221]
Details
|
7221 | ||||||||||||||
Application purpose:
Characteristics:
Installation diagram of sand traps and soft curbs for the option of installing sand traps in two rows Installation diagram of sand traps and soft curbs for the option of installing sand traps in one row General installation guidelines 1. The size of the concrete casing indicated in the drawings:
The depth of the trench from the design position of the upper layer of the sports covering to the upper layer of the frost-resistant layer:
2. Install the tracing line in accordance with the level, according to the project. 3. Sand traps and soft curbs are installed in a trench on a concrete base (foundation), the thickness of which should be d = 100 mm. The concrete base (foundation) is made of concrete grade B25 F200, W6, P4. The base (foundation) is equipped with a previously prepared frost-resistant layer. Temporary exposure of the foundation for 4-12 hours. 4. Equip a leveling layer of cement mortar in a ratio of 1: 3 with a thickness of 20-30 mm (cement mortar is prepared at the work site). A curb and a sand trap are installed together in the wet cement slurry in the design position, using a tracing string and a building level. The upper surface of the grit trap should be flush with the upper surface of the soft collapsible attachment of the soft curb. 5. The curb and sand trap are fixed with cement mortar - the caulking height is 30-50 mm. The cross-sectional shape of the caulking is triangular. 6. The concreting of the side parts is carried out with the concrete mixture B25 F200, W6, P4. The concrete mix is laid without breaks, with a consistent laying direction in one direction. The concrete mix is compacted by bayonetting, followed by leveling and grouting the surface of the laid mix. The width of the side parts of the concrete frame is specified in clause 1.
Download instructions for arranging a jump pit: General instructions for arranging a jump pit Download installation example: Running track / sand pit class A 15 Download installation example: Running track / sand pit class A 15 |
|||||||||||||||
Hauraton SPORTFIX Soft kerbs, black, 1000x60x300 mm (price on request) [Code number: 7222]
Details
|
7222 | ||||||||||||||
Application purpose:
Characteristics:
Installation diagram of sand traps and soft curbs for the option of installing sand traps in two rows Installation diagram of sand traps and soft curbs for the option of installing sand traps in one row General installation guidelines 1. The size of the concrete casing indicated in the drawings:
The depth of the trench from the design position of the upper layer of the sports covering to the upper layer of the frost-resistant layer:
2. Install the tracing line in accordance with the level, according to the project. 3. Sand traps and soft curbs are installed in a trench on a concrete base (foundation), the thickness of which should be d = 100 mm. The concrete base (foundation) is made of concrete grade B25 F200, W6, P4. The base (foundation) is equipped with a previously prepared frost-resistant layer. Temporary exposure of the foundation for 4-12 hours. 4. Equip a leveling layer of cement mortar in a ratio of 1: 3 with a thickness of 20-30 mm (cement mortar is prepared at the work site). A curb and a sand trap are installed together in the wet cement slurry in the design position, using a tracing string and a building level. The upper surface of the grit trap should be flush with the upper surface of the soft collapsible attachment of the soft curb. 5. The curb and sand trap are fixed with cement mortar - the caulking height is 30-50 mm. The cross-sectional shape of the caulking is triangular. 6. The concreting of the side parts is carried out with the concrete mixture B25 F200, W6, P4. The concrete mix is laid without breaks, with a consistent laying direction in one direction. The concrete mix is compacted by bayonetting, followed by leveling and grouting the surface of the laid mix. The width of the side parts of the concrete frame is specified in clause 1.
Download instructions for arranging a jump pit: General instructions for arranging a jump pit Download installation example: Running track / sand pit class A 15 Download installation example: Running track / sand pit class A 15 |
|||||||||||||||
Hauraton SPORTFIX Soft kerbs, black, 1000x60x400 mm (price on request) [Code number: 7223]
Details
|
7223 | ||||||||||||||
Application purpose:
Characteristics:
Installation diagram of sand traps and soft curbs for the option of installing sand traps in two rows Installation diagram of sand traps and soft curbs for the option of installing sand traps in one row General installation guidelines 1. The size of the concrete casing indicated in the drawings:
The depth of the trench from the design position of the upper layer of the sports covering to the upper layer of the frost-resistant layer:
2. Install the tracing line in accordance with the level, according to the project. 3. Sand traps and soft curbs are installed in a trench on a concrete base (foundation), the thickness of which should be d = 100 mm. The concrete base (foundation) is made of concrete grade B25 F200, W6, P4. The base (foundation) is equipped with a previously prepared frost-resistant layer. Temporary exposure of the foundation for 4-12 hours. 4. Equip a leveling layer of cement mortar in a ratio of 1: 3 with a thickness of 20-30 mm (cement mortar is prepared at the work site). A curb and a sand trap are installed together in the wet cement slurry in the design position, using a tracing string and a building level. The upper surface of the grit trap should be flush with the upper surface of the soft collapsible attachment of the soft curb. 5. The curb and sand trap are fixed with cement mortar - the caulking height is 30-50 mm. The cross-sectional shape of the caulking is triangular. 6. The concreting of the side parts is carried out with the concrete mixture B25 F200, W6, P4. The concrete mix is laid without breaks, with a consistent laying direction in one direction. The concrete mix is compacted by bayonetting, followed by leveling and grouting the surface of the laid mix. The width of the side parts of the concrete frame is specified in clause 1.
Download instructions for arranging a jump pit: General instructions for arranging a jump pit Download installation example: Running track / sand pit class A 15 Download installation example: Running track / sand pit class A 15 |
|||||||||||||||
Hauraton SPORTFIX Soft kerbs, black, 500x60x400 mm (price on request) [Code number: 7224]
Details
|
7224 | ||||||||||||||
Application purpose:
Characteristics:
Installation diagram of sand traps and soft curbs for the option of installing sand traps in two rows Installation diagram of sand traps and soft curbs for the option of installing sand traps in one row General installation guidelines 1. The size of the concrete casing indicated in the drawings:
The depth of the trench from the design position of the upper layer of the sports covering to the upper layer of the frost-resistant layer:
2. Install the tracing line in accordance with the level, according to the project. 3. Sand traps and soft curbs are installed in a trench on a concrete base (foundation), the thickness of which should be d = 100 mm. The concrete base (foundation) is made of concrete grade B25 F200, W6, P4. The base (foundation) is equipped with a previously prepared frost-resistant layer. Temporary exposure of the foundation for 4-12 hours. 4. Equip a leveling layer of cement mortar in a ratio of 1: 3 with a thickness of 20-30 mm (cement mortar is prepared at the work site). A curb and a sand trap are installed together in the wet cement slurry in the design position, using a tracing string and a building level. The upper surface of the grit trap should be flush with the upper surface of the soft collapsible attachment of the soft curb. 5. The curb and sand trap are fixed with cement mortar - the caulking height is 30-50 mm. The cross-sectional shape of the caulking is triangular. 6. The concreting of the side parts is carried out with the concrete mixture B25 F200, W6, P4. The concrete mix is laid without breaks, with a consistent laying direction in one direction. The concrete mix is compacted by bayonetting, followed by leveling and grouting the surface of the laid mix. The width of the side parts of the concrete frame is specified in clause 1.
Download instructions for arranging a jump pit: General instructions for arranging a jump pit Download installation example: Running track / sand pit class A 15 Download installation example: Running track / sand pit class A 15 |
|||||||||||||||
Hauraton SPORTFIX Soft kerbs, angle pieces, black, 250x60x300 mm (price on request) [Code number: 7228]
Details
|
7228 | ||||||||||||||
Application purpose:
Characteristics:
Installation diagram of sand traps and soft curbs for the option of installing sand traps in two rows Installation diagram of sand traps and soft curbs for the option of installing sand traps in one row General installation guidelines 1. The size of the concrete casing indicated in the drawings:
The depth of the trench from the design position of the upper layer of the sports covering to the upper layer of the frost-resistant layer:
2. Install the tracing line in accordance with the level, according to the project. 3. Sand traps and soft curbs are installed in a trench on a concrete base (foundation), the thickness of which should be d = 100 mm. The concrete base (foundation) is made of concrete grade B25 F200, W6, P4. The base (foundation) is equipped with a previously prepared frost-resistant layer. Temporary exposure of the foundation for 4-12 hours. 4. Equip a leveling layer of cement mortar in a ratio of 1: 3 with a thickness of 20-30 mm (cement mortar is prepared at the work site). A curb and a sand trap are installed together in the wet cement slurry in the design position, using a tracing string and a building level. The upper surface of the grit trap should be flush with the upper surface of the soft collapsible attachment of the soft curb. 5. The curb and sand trap are fixed with cement mortar - the caulking height is 30-50 mm. The cross-sectional shape of the caulking is triangular. 6. The concreting of the side parts is carried out with the concrete mixture B25 F200, W6, P4. The concrete mix is laid without breaks, with a consistent laying direction in one direction. The concrete mix is compacted by bayonetting, followed by leveling and grouting the surface of the laid mix. The width of the side parts of the concrete frame is specified in clause 1.
Download instructions for arranging a jump pit: General instructions for arranging a jump pit Download installation example: Running track / sand pit class A 15 Download installation example: Running track / sand pit class A 15 |
|||||||||||||||
Hauraton SPORTFIX Soft kerbs, angle pieces, black, 250x60x400 mm (price on request) [Code number: 7229]
Details
|
7229 | ||||||||||||||
Application purpose:
Characteristics:
Installation diagram of sand traps and soft curbs for the option of installing sand traps in two rows Installation diagram of sand traps and soft curbs for the option of installing sand traps in one row General installation guidelines 1. The size of the concrete casing indicated in the drawings:
The depth of the trench from the design position of the upper layer of the sports covering to the upper layer of the frost-resistant layer:
2. Install the tracing line in accordance with the level, according to the project. 3. Sand traps and soft curbs are installed in a trench on a concrete base (foundation), the thickness of which should be d = 100 mm. The concrete base (foundation) is made of concrete grade B25 F200, W6, P4. The base (foundation) is equipped with a previously prepared frost-resistant layer. Temporary exposure of the foundation for 4-12 hours. 4. Equip a leveling layer of cement mortar in a ratio of 1: 3 with a thickness of 20-30 mm (cement mortar is prepared at the work site). A curb and a sand trap are installed together in the wet cement slurry in the design position, using a tracing string and a building level. The upper surface of the grit trap should be flush with the upper surface of the soft collapsible attachment of the soft curb. 5. The curb and sand trap are fixed with cement mortar - the caulking height is 30-50 mm. The cross-sectional shape of the caulking is triangular. 6. The concreting of the side parts is carried out with the concrete mixture B25 F200, W6, P4. The concrete mix is laid without breaks, with a consistent laying direction in one direction. The concrete mix is compacted by bayonetting, followed by leveling and grouting the surface of the laid mix. The width of the side parts of the concrete frame is specified in clause 1.
Download instructions for arranging a jump pit: General instructions for arranging a jump pit Download installation example: Running track / sand pit class A 15 Download installation example: Running track / sand pit class A 15 |
|||||||||||||||
Hauraton SPORTFIX Soft kerbs for shot put areas, black, 1000x100x250 mm (price on request) [Code number: 7232]
Details
|
7232 | ||||||||||||||
|