Logo
Ru| En
Loading

Sewerage

The company "Inrusstrade" specializes in the supply of high-quality pipeline products for the installation of external and internal sewer systems.

Our catalog contains products of both European and Russian manufacturers from various materials. All offered products are known for their high quality and meet all sanitary requirements.

So, the catalog contains pipes and fittings made of cast iron, polyethylene and polypropylene, steel (chromium, stainless, galvanized).

We offer all the equipment necessary for the installation of sewer systems:

  • pipes and fittings;
  • connecting clamps;
  • brackets;
  • siphons;
  • traps;
  • fire-fighting couplings;
  • instrument pipes;
  • drainage channels etc.

All products are in stock and can be delivered to any region of Russia. For more information, call our managers.

Photo Name Article Price
Hauraton Installation aid NW 100 (2 pieces required) - due to security reasons no return can be made (price on request) [Code number: 705 (H)]
Details
705 (H)
Hauraton FASERFIX Philipp Spherical Head Lifting Clutch, 80-HKD-025, for laying trash boxes, galvanised, 2 pieces required (price on request) [Code number: 708]
Details
708
Hauraton SPORTFIX set (160 pieces) for 400 m track, including fixing material (price on request) [Code number: 7085]
Details
7085

Material:

  • Grating: Aluminium

Product description:

SPORTFIX Aluminium curbing made of anodized aluminium profiles, official track inside kerb for competitions, set for 400m track with radius 36,5m, incl. fixing material.

Length Width Height Weight
mm mm mm kg
2500 60 40 450,00

Download product data sheet: 7085 Hauraton SPORTFIX set

Hauraton SPORTFIX Type PARIS installation kit (price on request) [Code number: 715]
Details
715
Hauraton SPORTFIX Cover with underframe for water jump, 3656x3417x520 mm (price on request) [Code number: 7152]
Details
7152

Material:

  • Grating: Aluminium

Product description:

SPORTFIX Cover for water jump with supporting construction, made of aluminium profile, can be individually coated for unobtrusive integration into the surroundings.

Length Width Height Weight
mm mm mm kg
3656 3417 520 278,00

Download product data sheet: 7152 Hauraton SPORTFIX Cover with underframe for water jump

Hauraton SPORTFIX Soft kerbs, white, 1000x60x200 mm (price on request) [Code number: 7200]
Details
7200

Application purpose:

  • Playing field drainage
  • Playing field borders
  • Sports grounds

Installation diagram of sand traps and soft curbs for the option of installing sand traps in two rows

Installation diagram of sand traps and soft curbs for the option of installing sand traps in one row

General installation guidelines

1. The size of the concrete casing indicated in the drawings:

  • b = 100 mm;
  • d = 100 mm;
  • h = approx. 60 mm

The depth of the trench from the design position of the upper layer of the sports covering to the upper layer of the frost-resistant layer:

  • at the place where the sand trap is installed = sand trap height + 100 mm + 20-30 mm;
  • at the installation site of the soft curb = curb height + 100 mm + 20-30 mm.

2. Install the tracing line in accordance with the level, according to the project.

3. Sand traps and soft curbs are installed in a trench on a concrete base (foundation), the thickness of which should be d = 100 mm. The concrete base (foundation) is made of concrete grade B25 F200, W6, P4. The base (foundation) is equipped with a previously prepared frost-resistant layer. Temporary exposure of the foundation for 4-12 hours.

4. Equip a leveling layer of cement mortar in a ratio of 1: 3 with a thickness of 20-30 mm (cement mortar is prepared at the work site). A curb and a sand trap are installed together in the wet cement slurry in the design position, using a tracing string and a building level. The upper surface of the grit trap should be flush with the upper surface of the soft collapsible attachment of the soft curb.

5. The curb and sand trap are fixed with cement mortar - the caulking height is 30-50 mm. The cross-sectional shape of the caulking is triangular.

6. The concreting of the side parts is carried out with the concrete mixture B25 F200, W6, P4.

The concrete mix is ​​laid without breaks, with a consistent laying direction in one direction. The concrete mix is ​​compacted by bayonetting, followed by leveling and grouting the surface of the laid mix. The width of the side parts of the concrete frame is specified in clause 1.

Length Width Height Weight
mm mm mm kg
1000 60 200 26,04

Download instructions for arranging a jump pit: 7740 (H) General instructions for arranging a jump pit

Download installation example: 7200 Running track / sand pit class A 15

Download installation example: 7200 Running track / sand pit class A 15

Hauraton SPORTFIX Soft kerbs, white, 1000x60x250 mm (price on request) [Code number: 7201]
Details
7201

Application purpose:

  • Playing field drainage
  • Playing field borders
  • Sports grounds

Installation diagram of sand traps and soft curbs for the option of installing sand traps in two rows

Installation diagram of sand traps and soft curbs for the option of installing sand traps in one row

General installation guidelines

1. The size of the concrete casing indicated in the drawings:

  • b = 100 mm;
  • d = 100 mm;
  • h = approx. 60 mm

The depth of the trench from the design position of the upper layer of the sports covering to the upper layer of the frost-resistant layer:

  • at the place where the sand trap is installed = sand trap height + 100 mm + 20-30 mm;
  • at the installation site of the soft curb = curb height + 100 mm + 20-30 mm.

2. Install the tracing line in accordance with the level, according to the project.

3. Sand traps and soft curbs are installed in a trench on a concrete base (foundation), the thickness of which should be d = 100 mm. The concrete base (foundation) is made of concrete grade B25 F200, W6, P4. The base (foundation) is equipped with a previously prepared frost-resistant layer. Temporary exposure of the foundation for 4-12 hours.

4. Equip a leveling layer of cement mortar in a ratio of 1: 3 with a thickness of 20-30 mm (cement mortar is prepared at the work site). A curb and a sand trap are installed together in the wet cement slurry in the design position, using a tracing string and a building level. The upper surface of the grit trap should be flush with the upper surface of the soft collapsible attachment of the soft curb.

5. The curb and sand trap are fixed with cement mortar - the caulking height is 30-50 mm. The cross-sectional shape of the caulking is triangular.

6. The concreting of the side parts is carried out with the concrete mixture B25 F200, W6, P4.

The concrete mix is ​​laid without breaks, with a consistent laying direction in one direction. The concrete mix is ​​compacted by bayonetting, followed by leveling and grouting the surface of the laid mix. The width of the side parts of the concrete frame is specified in clause 1.

Length Width Height Weight
mm mm mm kg
1000 60 250 33,12

Download instructions for arranging a jump pit: 7740 (H) General instructions for arranging a jump pit

Download installation example: 7201 Running track / sand pit class A 15

Download installation example: 7201 Running track / sand pit class A 15

Hauraton SPORTFIX Soft kerbs, white, 1000x60x300 mm (price on request) [Code number: 7202]
Details
7202

Application purpose:

  • Playing field drainage
  • Playing field borders
  • Sports grounds

Installation diagram of sand traps and soft curbs for the option of installing sand traps in two rows

Installation diagram of sand traps and soft curbs for the option of installing sand traps in one row

General installation guidelines

1. The size of the concrete casing indicated in the drawings:

  • b = 100 mm;
  • d = 100 mm;
  • h = approx. 60 mm

The depth of the trench from the design position of the upper layer of the sports covering to the upper layer of the frost-resistant layer:

  • at the place where the sand trap is installed = sand trap height + 100 mm + 20-30 mm;
  • at the installation site of the soft curb = curb height + 100 mm + 20-30 mm.

2. Install the tracing line in accordance with the level, according to the project.

3. Sand traps and soft curbs are installed in a trench on a concrete base (foundation), the thickness of which should be d = 100 mm. The concrete base (foundation) is made of concrete grade B25 F200, W6, P4. The base (foundation) is equipped with a previously prepared frost-resistant layer. Temporary exposure of the foundation for 4-12 hours.

4. Equip a leveling layer of cement mortar in a ratio of 1: 3 with a thickness of 20-30 mm (cement mortar is prepared at the work site). A curb and a sand trap are installed together in the wet cement slurry in the design position, using a tracing string and a building level. The upper surface of the grit trap should be flush with the upper surface of the soft collapsible attachment of the soft curb.

5. The curb and sand trap are fixed with cement mortar - the caulking height is 30-50 mm. The cross-sectional shape of the caulking is triangular.

6. The concreting of the side parts is carried out with the concrete mixture B25 F200, W6, P4.

The concrete mix is ​​laid without breaks, with a consistent laying direction in one direction. The concrete mix is ​​compacted by bayonetting, followed by leveling and grouting the surface of the laid mix. The width of the side parts of the concrete frame is specified in clause 1.

Length Width Height Weight
mm mm mm kg
1000 60 300 39,62

Download instructions for arranging a jump pit: 7740 (H) General instructions for arranging a jump pit

Download installation example: 7202 Running track / sand pit class A 15

Download installation example: 7202 Running track / sand pit class A 15

Hauraton SPORTFIX Soft kerbs, white, 1000x60x400 mm (price on request) [Code number: 7203]
Details
7203

Application purpose:

  • Playing field drainage
  • Playing field borders
  • Sports grounds

Installation diagram of sand traps and soft curbs for the option of installing sand traps in two rows

Installation diagram of sand traps and soft curbs for the option of installing sand traps in one row

General installation guidelines

1. The size of the concrete casing indicated in the drawings:

  • b = 100 mm;
  • d = 100 mm;
  • h = approx. 60 mm

The depth of the trench from the design position of the upper layer of the sports covering to the upper layer of the frost-resistant layer:

  • at the place where the sand trap is installed = sand trap height + 100 mm + 20-30 mm;
  • at the installation site of the soft curb = curb height + 100 mm + 20-30 mm.

2. Install the tracing line in accordance with the level, according to the project.

3. Sand traps and soft curbs are installed in a trench on a concrete base (foundation), the thickness of which should be d = 100 mm. The concrete base (foundation) is made of concrete grade B25 F200, W6, P4. The base (foundation) is equipped with a previously prepared frost-resistant layer. Temporary exposure of the foundation for 4-12 hours.

4. Equip a leveling layer of cement mortar in a ratio of 1: 3 with a thickness of 20-30 mm (cement mortar is prepared at the work site). A curb and a sand trap are installed together in the wet cement slurry in the design position, using a tracing string and a building level. The upper surface of the grit trap should be flush with the upper surface of the soft collapsible attachment of the soft curb.

5. The curb and sand trap are fixed with cement mortar - the caulking height is 30-50 mm. The cross-sectional shape of the caulking is triangular.

6. The concreting of the side parts is carried out with the concrete mixture B25 F200, W6, P4.

The concrete mix is ​​laid without breaks, with a consistent laying direction in one direction. The concrete mix is ​​compacted by bayonetting, followed by leveling and grouting the surface of the laid mix. The width of the side parts of the concrete frame is specified in clause 1.

Length Width Height Weight
mm mm mm kg
1000 60 400 53,00

Download instructions for arranging a jump pit: 7740 (H) General instructions for arranging a jump pit

Download installation example: 7203 Running track / sand pit class A 15

Download installation example: 7203 Running track / sand pit class A 15

Hauraton SPORTFIX Soft kerbs, white, 500x60x400 mm (price on request) [Code number: 7204]
Details
7204

Application purpose:

  • Playing field drainage
  • Playing field borders
  • Sports grounds

Installation diagram of sand traps and soft curbs for the option of installing sand traps in two rows

Installation diagram of sand traps and soft curbs for the option of installing sand traps in one row

General installation guidelines

1. The size of the concrete casing indicated in the drawings:

  • b = 100 mm;
  • d = 100 mm;
  • h = approx. 60 mm

The depth of the trench from the design position of the upper layer of the sports covering to the upper layer of the frost-resistant layer:

  • at the place where the sand trap is installed = sand trap height + 100 mm + 20-30 mm;
  • at the installation site of the soft curb = curb height + 100 mm + 20-30 mm.

2. Install the tracing line in accordance with the level, according to the project.

3. Sand traps and soft curbs are installed in a trench on a concrete base (foundation), the thickness of which should be d = 100 mm. The concrete base (foundation) is made of concrete grade B25 F200, W6, P4. The base (foundation) is equipped with a previously prepared frost-resistant layer. Temporary exposure of the foundation for 4-12 hours.

4. Equip a leveling layer of cement mortar in a ratio of 1: 3 with a thickness of 20-30 mm (cement mortar is prepared at the work site). A curb and a sand trap are installed together in the wet cement slurry in the design position, using a tracing string and a building level. The upper surface of the grit trap should be flush with the upper surface of the soft collapsible attachment of the soft curb.

5. The curb and sand trap are fixed with cement mortar - the caulking height is 30-50 mm. The cross-sectional shape of the caulking is triangular.

6. The concreting of the side parts is carried out with the concrete mixture B25 F200, W6, P4.

The concrete mix is ​​laid without breaks, with a consistent laying direction in one direction. The concrete mix is ​​compacted by bayonetting, followed by leveling and grouting the surface of the laid mix. The width of the side parts of the concrete frame is specified in clause 1.

Length Width Height Weight
mm mm mm kg
500 60 400 25,60

Download instructions for arranging a jump pit: 7740 (H) General instructions for arranging a jump pit

Download installation example: 7204 Running track / sand pit class A 15

Download installation example: 7204 Running track / sand pit class A 15

Hauraton SPORTFIX Soft kerbs, angle pieces, white, 250x60x300 mm (price on request) [Code number: 7208]
Details
7208

Application purpose:

  • Playing field drainage
  • Playing field borders
  • Sports grounds

Installation diagram of sand traps and soft curbs for the option of installing sand traps in two rows

Installation diagram of sand traps and soft curbs for the option of installing sand traps in one row

General installation guidelines

1. The size of the concrete casing indicated in the drawings:

  • b = 100 mm;
  • d = 100 mm;
  • h = approx. 60 mm

The depth of the trench from the design position of the upper layer of the sports covering to the upper layer of the frost-resistant layer:

  • at the place where the sand trap is installed = sand trap height + 100 mm + 20-30 mm;
  • at the installation site of the soft curb = curb height + 100 mm + 20-30 mm.

2. Install the tracing line in accordance with the level, according to the project.

3. Sand traps and soft curbs are installed in a trench on a concrete base (foundation), the thickness of which should be d = 100 mm. The concrete base (foundation) is made of concrete grade B25 F200, W6, P4. The base (foundation) is equipped with a previously prepared frost-resistant layer. Temporary exposure of the foundation for 4-12 hours.

4. Equip a leveling layer of cement mortar in a ratio of 1: 3 with a thickness of 20-30 mm (cement mortar is prepared at the work site). A curb and a sand trap are installed together in the wet cement slurry in the design position, using a tracing string and a building level. The upper surface of the grit trap should be flush with the upper surface of the soft collapsible attachment of the soft curb.

5. The curb and sand trap are fixed with cement mortar - the caulking height is 30-50 mm. The cross-sectional shape of the caulking is triangular.

6. The concreting of the side parts is carried out with the concrete mixture B25 F200, W6, P4.

The concrete mix is ​​laid without breaks, with a consistent laying direction in one direction. The concrete mix is ​​compacted by bayonetting, followed by leveling and grouting the surface of the laid mix. The width of the side parts of the concrete frame is specified in clause 1.

Length Width Height Weight
mm mm mm kg
250 60 300 18,00

Download instructions for arranging a jump pit: 7740 (H) General instructions for arranging a jump pit

Download installation example: 7208 Running track / sand pit class A 15

Download installation example: 7208 Running track / sand pit class A 15

Hauraton SPORTFIX Soft kerbs, angle pieces, white, 250x60x400 mm (price on request) [Code number: 7209]
Details
7209

Application purpose:

  • Playing field drainage
  • Playing field borders
  • Sports grounds

Installation diagram of sand traps and soft curbs for the option of installing sand traps in two rows

Installation diagram of sand traps and soft curbs for the option of installing sand traps in one row

General installation guidelines

1. The size of the concrete casing indicated in the drawings:

  • b = 100 mm;
  • d = 100 mm;
  • h = approx. 60 mm

The depth of the trench from the design position of the upper layer of the sports covering to the upper layer of the frost-resistant layer:

  • at the place where the sand trap is installed = sand trap height + 100 mm + 20-30 mm;
  • at the installation site of the soft curb = curb height + 100 mm + 20-30 mm.

2. Install the tracing line in accordance with the level, according to the project.

3. Sand traps and soft curbs are installed in a trench on a concrete base (foundation), the thickness of which should be d = 100 mm. The concrete base (foundation) is made of concrete grade B25 F200, W6, P4. The base (foundation) is equipped with a previously prepared frost-resistant layer. Temporary exposure of the foundation for 4-12 hours.

4. Equip a leveling layer of cement mortar in a ratio of 1: 3 with a thickness of 20-30 mm (cement mortar is prepared at the work site). A curb and a sand trap are installed together in the wet cement slurry in the design position, using a tracing string and a building level. The upper surface of the grit trap should be flush with the upper surface of the soft collapsible attachment of the soft curb.

5. The curb and sand trap are fixed with cement mortar - the caulking height is 30-50 mm. The cross-sectional shape of the caulking is triangular.

6. The concreting of the side parts is carried out with the concrete mixture B25 F200, W6, P4.

The concrete mix is ​​laid without breaks, with a consistent laying direction in one direction. The concrete mix is ​​compacted by bayonetting, followed by leveling and grouting the surface of the laid mix. The width of the side parts of the concrete frame is specified in clause 1.

Length Width Height Weight
mm mm mm kg
250 60 400 23,00

Download instructions for arranging a jump pit: 7740 (H) General instructions for arranging a jump pit

Download installation example: 7209 Running track / sand pit class A 15

Download installation example: 7209 Running track / sand pit class A 15

Hauraton SPORTFIX Soft kerbs, black, 1000x60x200 mm (price on request) [Code number: 7220]
Details
7220

Application purpose:

  • Playing field drainage
  • Playing field borders
  • Sports grounds

Characteristics:

  • Color: black

Installation diagram of sand traps and soft curbs for the option of installing sand traps in two rows

Installation diagram of sand traps and soft curbs for the option of installing sand traps in one row

General installation guidelines

1. The size of the concrete casing indicated in the drawings:

  • b = 100 mm;
  • d = 100 mm;
  • h = approx. 60 mm

The depth of the trench from the design position of the upper layer of the sports covering to the upper layer of the frost-resistant layer:

  • at the place where the sand trap is installed = sand trap height + 100 mm + 20-30 mm;
  • at the installation site of the soft curb = curb height + 100 mm + 20-30 mm.

2. Install the tracing line in accordance with the level, according to the project.

3. Sand traps and soft curbs are installed in a trench on a concrete base (foundation), the thickness of which should be d = 100 mm. The concrete base (foundation) is made of concrete grade B25 F200, W6, P4. The base (foundation) is equipped with a previously prepared frost-resistant layer. Temporary exposure of the foundation for 4-12 hours.

4. Equip a leveling layer of cement mortar in a ratio of 1: 3 with a thickness of 20-30 mm (cement mortar is prepared at the work site). A curb and a sand trap are installed together in the wet cement slurry in the design position, using a tracing string and a building level. The upper surface of the grit trap should be flush with the upper surface of the soft collapsible attachment of the soft curb.

5. The curb and sand trap are fixed with cement mortar - the caulking height is 30-50 mm. The cross-sectional shape of the caulking is triangular.

6. The concreting of the side parts is carried out with the concrete mixture B25 F200, W6, P4.

The concrete mix is ​​laid without breaks, with a consistent laying direction in one direction. The concrete mix is ​​compacted by bayonetting, followed by leveling and grouting the surface of the laid mix. The width of the side parts of the concrete frame is specified in clause 1.

Length Width Height Weight
mm mm mm kg
1000 60 200 25,87

Download instructions for arranging a jump pit: 7740 (H) General instructions for arranging a jump pit

Download installation example: 7740 (H) Running track / sand pit class A 15

Download installation example: 7740 (H) Running track / sand pit class A 15

Hauraton SPORTFIX Soft kerbs, black, 1000x60x250 mm (price on request) [Code number: 7221]
Details
7221

Application purpose:

  • Playing field drainage
  • Playing field borders
  • Sports grounds

Characteristics:

  • Color: black

Installation diagram of sand traps and soft curbs for the option of installing sand traps in two rows

Installation diagram of sand traps and soft curbs for the option of installing sand traps in one row

General installation guidelines

1. The size of the concrete casing indicated in the drawings:

  • b = 100 mm;
  • d = 100 mm;
  • h = approx. 60 mm

The depth of the trench from the design position of the upper layer of the sports covering to the upper layer of the frost-resistant layer:

  • at the place where the sand trap is installed = sand trap height + 100 mm + 20-30 mm;
  • at the installation site of the soft curb = curb height + 100 mm + 20-30 mm.

2. Install the tracing line in accordance with the level, according to the project.

3. Sand traps and soft curbs are installed in a trench on a concrete base (foundation), the thickness of which should be d = 100 mm. The concrete base (foundation) is made of concrete grade B25 F200, W6, P4. The base (foundation) is equipped with a previously prepared frost-resistant layer. Temporary exposure of the foundation for 4-12 hours.

4. Equip a leveling layer of cement mortar in a ratio of 1: 3 with a thickness of 20-30 mm (cement mortar is prepared at the work site). A curb and a sand trap are installed together in the wet cement slurry in the design position, using a tracing string and a building level. The upper surface of the grit trap should be flush with the upper surface of the soft collapsible attachment of the soft curb.

5. The curb and sand trap are fixed with cement mortar - the caulking height is 30-50 mm. The cross-sectional shape of the caulking is triangular.

6. The concreting of the side parts is carried out with the concrete mixture B25 F200, W6, P4.

The concrete mix is ​​laid without breaks, with a consistent laying direction in one direction. The concrete mix is ​​compacted by bayonetting, followed by leveling and grouting the surface of the laid mix. The width of the side parts of the concrete frame is specified in clause 1.

Length Width Height Weight
mm mm mm kg
1000 60 250 33,01

Download instructions for arranging a jump pit: 7740 (H) General instructions for arranging a jump pit

Download installation example: 7221 Running track / sand pit class A 15

Download installation example: 7221 Running track / sand pit class A 15

Hauraton SPORTFIX Soft kerbs, black, 1000x60x300 mm (price on request) [Code number: 7222]
Details
7222

Application purpose:

  • Playing field drainage
  • Playing field borders
  • Sports grounds

Characteristics:

  • Color: black

Installation diagram of sand traps and soft curbs for the option of installing sand traps in two rows

Installation diagram of sand traps and soft curbs for the option of installing sand traps in one row

General installation guidelines

1. The size of the concrete casing indicated in the drawings:

  • b = 100 mm;
  • d = 100 mm;
  • h = approx. 60 mm

The depth of the trench from the design position of the upper layer of the sports covering to the upper layer of the frost-resistant layer:

  • at the place where the sand trap is installed = sand trap height + 100 mm + 20-30 mm;
  • at the installation site of the soft curb = curb height + 100 mm + 20-30 mm.

2. Install the tracing line in accordance with the level, according to the project.

3. Sand traps and soft curbs are installed in a trench on a concrete base (foundation), the thickness of which should be d = 100 mm. The concrete base (foundation) is made of concrete grade B25 F200, W6, P4. The base (foundation) is equipped with a previously prepared frost-resistant layer. Temporary exposure of the foundation for 4-12 hours.

4. Equip a leveling layer of cement mortar in a ratio of 1: 3 with a thickness of 20-30 mm (cement mortar is prepared at the work site). A curb and a sand trap are installed together in the wet cement slurry in the design position, using a tracing string and a building level. The upper surface of the grit trap should be flush with the upper surface of the soft collapsible attachment of the soft curb.

5. The curb and sand trap are fixed with cement mortar - the caulking height is 30-50 mm. The cross-sectional shape of the caulking is triangular.

6. The concreting of the side parts is carried out with the concrete mixture B25 F200, W6, P4.

The concrete mix is ​​laid without breaks, with a consistent laying direction in one direction. The concrete mix is ​​compacted by bayonetting, followed by leveling and grouting the surface of the laid mix. The width of the side parts of the concrete frame is specified in clause 1.

Length Width Height Weight
mm mm mm kg
1000 60 300 38,90

Download instructions for arranging a jump pit: 7740 (H) General instructions for arranging a jump pit

Download installation example: 7222 Running track / sand pit class A 15

Download installation example: 7222 Running track / sand pit class A 15

Hauraton SPORTFIX Soft kerbs, black, 1000x60x400 mm (price on request) [Code number: 7223]
Details
7223

Application purpose:

  • Playing field drainage
  • Playing field borders
  • Sports grounds

Characteristics:

  • Color: black

Installation diagram of sand traps and soft curbs for the option of installing sand traps in two rows

Installation diagram of sand traps and soft curbs for the option of installing sand traps in one row

General installation guidelines

1. The size of the concrete casing indicated in the drawings:

  • b = 100 mm;
  • d = 100 mm;
  • h = approx. 60 mm

The depth of the trench from the design position of the upper layer of the sports covering to the upper layer of the frost-resistant layer:

  • at the place where the sand trap is installed = sand trap height + 100 mm + 20-30 mm;
  • at the installation site of the soft curb = curb height + 100 mm + 20-30 mm.

2. Install the tracing line in accordance with the level, according to the project.

3. Sand traps and soft curbs are installed in a trench on a concrete base (foundation), the thickness of which should be d = 100 mm. The concrete base (foundation) is made of concrete grade B25 F200, W6, P4. The base (foundation) is equipped with a previously prepared frost-resistant layer. Temporary exposure of the foundation for 4-12 hours.

4. Equip a leveling layer of cement mortar in a ratio of 1: 3 with a thickness of 20-30 mm (cement mortar is prepared at the work site). A curb and a sand trap are installed together in the wet cement slurry in the design position, using a tracing string and a building level. The upper surface of the grit trap should be flush with the upper surface of the soft collapsible attachment of the soft curb.

5. The curb and sand trap are fixed with cement mortar - the caulking height is 30-50 mm. The cross-sectional shape of the caulking is triangular.

6. The concreting of the side parts is carried out with the concrete mixture B25 F200, W6, P4.

The concrete mix is ​​laid without breaks, with a consistent laying direction in one direction. The concrete mix is ​​compacted by bayonetting, followed by leveling and grouting the surface of the laid mix. The width of the side parts of the concrete frame is specified in clause 1.

Length Width Height Weight
mm mm mm kg
1000 60 400 53,20

Download instructions for arranging a jump pit: 7740 (H) General instructions for arranging a jump pit

Download installation example: 7223 Running track / sand pit class A 15

Download installation example: 7223 Running track / sand pit class A 15

Hauraton SPORTFIX Soft kerbs, black, 500x60x400 mm (price on request) [Code number: 7224]
Details
7224

Application purpose:

  • Playing field drainage
  • Playing field borders
  • Sports grounds

Characteristics:

  • Color: black

Installation diagram of sand traps and soft curbs for the option of installing sand traps in two rows

Installation diagram of sand traps and soft curbs for the option of installing sand traps in one row

General installation guidelines

1. The size of the concrete casing indicated in the drawings:

  • b = 100 mm;
  • d = 100 mm;
  • h = approx. 60 mm

The depth of the trench from the design position of the upper layer of the sports covering to the upper layer of the frost-resistant layer:

  • at the place where the sand trap is installed = sand trap height + 100 mm + 20-30 mm;
  • at the installation site of the soft curb = curb height + 100 mm + 20-30 mm.

2. Install the tracing line in accordance with the level, according to the project.

3. Sand traps and soft curbs are installed in a trench on a concrete base (foundation), the thickness of which should be d = 100 mm. The concrete base (foundation) is made of concrete grade B25 F200, W6, P4. The base (foundation) is equipped with a previously prepared frost-resistant layer. Temporary exposure of the foundation for 4-12 hours.

4. Equip a leveling layer of cement mortar in a ratio of 1: 3 with a thickness of 20-30 mm (cement mortar is prepared at the work site). A curb and a sand trap are installed together in the wet cement slurry in the design position, using a tracing string and a building level. The upper surface of the grit trap should be flush with the upper surface of the soft collapsible attachment of the soft curb.

5. The curb and sand trap are fixed with cement mortar - the caulking height is 30-50 mm. The cross-sectional shape of the caulking is triangular.

6. The concreting of the side parts is carried out with the concrete mixture B25 F200, W6, P4.

The concrete mix is ​​laid without breaks, with a consistent laying direction in one direction. The concrete mix is ​​compacted by bayonetting, followed by leveling and grouting the surface of the laid mix. The width of the side parts of the concrete frame is specified in clause 1.

Length Width Height Weight
mm mm mm kg
500 60 400 25,20

Download instructions for arranging a jump pit: 7740 (H) General instructions for arranging a jump pit

Download installation example: 7224 Running track / sand pit class A 15

Download installation example: 7224 Running track / sand pit class A 15

Hauraton SPORTFIX Soft kerbs, angle pieces, black, 250x60x300 mm (price on request) [Code number: 7228]
Details
7228

Application purpose:

  • Playing field drainage
  • Playing field borders
  • Sports grounds

Characteristics:

  • Color: black

Installation diagram of sand traps and soft curbs for the option of installing sand traps in two rows

Installation diagram of sand traps and soft curbs for the option of installing sand traps in one row

General installation guidelines

1. The size of the concrete casing indicated in the drawings:

  • b = 100 mm;
  • d = 100 mm;
  • h = approx. 60 mm

The depth of the trench from the design position of the upper layer of the sports covering to the upper layer of the frost-resistant layer:

  • at the place where the sand trap is installed = sand trap height + 100 mm + 20-30 mm;
  • at the installation site of the soft curb = curb height + 100 mm + 20-30 mm.

2. Install the tracing line in accordance with the level, according to the project.

3. Sand traps and soft curbs are installed in a trench on a concrete base (foundation), the thickness of which should be d = 100 mm. The concrete base (foundation) is made of concrete grade B25 F200, W6, P4. The base (foundation) is equipped with a previously prepared frost-resistant layer. Temporary exposure of the foundation for 4-12 hours.

4. Equip a leveling layer of cement mortar in a ratio of 1: 3 with a thickness of 20-30 mm (cement mortar is prepared at the work site). A curb and a sand trap are installed together in the wet cement slurry in the design position, using a tracing string and a building level. The upper surface of the grit trap should be flush with the upper surface of the soft collapsible attachment of the soft curb.

5. The curb and sand trap are fixed with cement mortar - the caulking height is 30-50 mm. The cross-sectional shape of the caulking is triangular.

6. The concreting of the side parts is carried out with the concrete mixture B25 F200, W6, P4.

The concrete mix is ​​laid without breaks, with a consistent laying direction in one direction. The concrete mix is ​​compacted by bayonetting, followed by leveling and grouting the surface of the laid mix. The width of the side parts of the concrete frame is specified in clause 1.

Length Width Height Weight
mm mm mm kg
250 60 300 16,40

Download instructions for arranging a jump pit: 7740 (H) General instructions for arranging a jump pit

Download installation example: 7228 Running track / sand pit class A 15

Download installation example: 7228 Running track / sand pit class A 15

Hauraton SPORTFIX Soft kerbs, angle pieces, black, 250x60x400 mm (price on request) [Code number: 7229]
Details
7229

Application purpose:

  • Playing field drainage
  • Playing field borders
  • Sports grounds

Characteristics:

  • Color: black

Installation diagram of sand traps and soft curbs for the option of installing sand traps in two rows

Installation diagram of sand traps and soft curbs for the option of installing sand traps in one row

General installation guidelines

1. The size of the concrete casing indicated in the drawings:

  • b = 100 mm;
  • d = 100 mm;
  • h = approx. 60 mm

The depth of the trench from the design position of the upper layer of the sports covering to the upper layer of the frost-resistant layer:

  • at the place where the sand trap is installed = sand trap height + 100 mm + 20-30 mm;
  • at the installation site of the soft curb = curb height + 100 mm + 20-30 mm.

2. Install the tracing line in accordance with the level, according to the project.

3. Sand traps and soft curbs are installed in a trench on a concrete base (foundation), the thickness of which should be d = 100 mm. The concrete base (foundation) is made of concrete grade B25 F200, W6, P4. The base (foundation) is equipped with a previously prepared frost-resistant layer. Temporary exposure of the foundation for 4-12 hours.

4. Equip a leveling layer of cement mortar in a ratio of 1: 3 with a thickness of 20-30 mm (cement mortar is prepared at the work site). A curb and a sand trap are installed together in the wet cement slurry in the design position, using a tracing string and a building level. The upper surface of the grit trap should be flush with the upper surface of the soft collapsible attachment of the soft curb.

5. The curb and sand trap are fixed with cement mortar - the caulking height is 30-50 mm. The cross-sectional shape of the caulking is triangular.

6. The concreting of the side parts is carried out with the concrete mixture B25 F200, W6, P4.

The concrete mix is ​​laid without breaks, with a consistent laying direction in one direction. The concrete mix is ​​compacted by bayonetting, followed by leveling and grouting the surface of the laid mix. The width of the side parts of the concrete frame is specified in clause 1.

Length Width Height Weight
mm mm mm kg
250 60 400 28,61

Download instructions for arranging a jump pit: 7740 (H) General instructions for arranging a jump pit

Download installation example: 7229 Running track / sand pit class A 15

Download installation example: 7229 Running track / sand pit class A 15

Hauraton SPORTFIX Soft kerbs for shot put areas, black, 1000x100x250 mm (price on request) [Code number: 7232]
Details
7232