Combinations with bends and tees PAM-GLOBAL® S (bends with elongated side 250mm)

Connection of PAM tee 45˚ and bend 45˚ (outlet at the top)

Tee 45˚ DN Bend 45˚ DN A max A min B max B min L K
70х70 70 283 149 398 264 200 190
100х70 70 301 166 406 271 215 190
100х100 100 315 187 455 327 260 180
125х70 70 311 177 411 277 225 190
125х100 100 329 202 459 332 270 180
For the practice of construction a shortening ratio 1:1.5 is actual. When reducing the distances A and B at 1 cm (both changed the same way) the elbow should be shortened at 1.5 cm.

 

Connection of PAM tee 45˚ and bend 45˚ (outlet at the bottom)

Tee 45˚ DN Bend 45˚ DN A max A min B max B min L K
70х70 70 343 209 338 204 200 190
100х70 70 361 226 346 212 215 190
100х100 100 385 257 385 257 260 180
125х70 70 371 237 351 217 225 190
125х100 100 399 272 389 262 270 180

 

Horizontal connection of PAM tee 88˚ and bend 88˚

Tee 88˚ DN Bend 88˚ DN A max A min B max B min L K
70х70 70 350 190 187 187 180 160
100х70 70 365 205 192 192 190 160
100х100 100 370 230 225 225 220 140
125х70 70 380 220 197 197 200 160
125х100 100 385 245 235 235 235 140  